ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 Removal of chimney, placing of floor joists, subfloor and finish floor. Installation of partial roof where the chimney was removed. Rearranging of bathroom in the basement. Lowering the basement floor 6 inches to the lower elevation - no underpinning. No mechanical, no plumbing. Date: April 24, 2017 Contractor: Peter Gwynn; Stanley FreemanClient: Peter Gwynn | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1707324 | |||||
SCORE 59 Building Date: May 3, 2017 Contractor: Peter GwynnClient: Peter Gwynn | Permit status: Permit issued | Permit id: Bp1702994 | |||||
SCORE 82 Electrical Date: April 27, 2017 Contractor: Ralph E. ThreattClient: Peter Gwynn | Permit status: Permit issued | Permit id: E1705964 | |||||
SCORE 100 Plumbing and gas Date: April 27, 2017 Contractor: Jerone ScottClient: Peter Gwynn | Permit status: Permit issued | Permit id: P1705464 | |||||
SCORE 96 Mechanical Date: May 3, 2017 Contractor: Donald V. EllenbergerClient: Peter Gwynn | Permit status: Permit issued | Permit id: M1702160 | |||||
SCORE 56 Revision to b1707324 remove the existing fixtures in the basement bathroom and replace with new bathroom fixtures. Remove and replace boiler with new to accommodate the existing radiators. Remove and replace hot water heater. Relocate the floor drain in the mechanical room. Date: July 13, 2017 Contractor: Stanley Zukeh FreemanClient: Peter Gwynn | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1710846 |