Building Permits at 1002 M St Nw, Washington, DC 20001


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1002 M St Nw, Washington, DC 20001 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Perform 6 geotechnical soil borings with a truck mounted auger drill rig. Each boring will be advanced using 3. 25 inch hollow stem augers creating an approximate 6 inch annuls, 4 will be extended to a depth of feet below the existing ground surface and the remaining two will be advanced to a depth of 1 feet below the existing ground surface. Perform 7 direct push geoprobe borings with a truck or track mounted geoprobe drill rig. Each of the 7 geobrobe borings will be advanced to depths ranging from 5 to feet below the existing ground surface.
Date:  June 11, 2014

Client: Mr. Dodd Walker Akridge | Applicant: Stephen Patt Ecs Mid-Atlantic, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400330
2014/06/110951002 M St Nw Washington Dc 20001
SCORE
65
Perform 6 geotechnical soil borings with a truck mounted auger drill rig. Each boring will be advanced using 3. 25 inch hollow stem augers creating an approximate 6 inch annuls, 4 will be extended to a depth of feet below the existing ground surface and the remaining two will be advanced to a depth of 1 feet below the existing ground surface. Perform 7 direct push geoprobe borings with a truck or track mounted geoprobe drill rig. Each of the 7 geobrobe borings will be advanced to depths ranging from 5 to feet below the existing ground surface.
Date:  June 11, 2014

Client: Mr. Dodd Walker Akridge | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400330
2014/06/110651002 M St Nw, Washington, Dc 20001Stephen Patt Ecs Midatlantic Llc
SCORE
65
Perform 6 geotechnical soil borings with a truck mounted auger drill rig. Each boring will be advanced using 3. 25 inch hollow stem augers creating an approximate 6 inch annuls, 4 will be extended to a depth of feet below the existing ground surface and the remaining two will be advanced to a depth of 1 feet below the existing ground surface. Perform 7 direct push geoprobe borings with a truck or track mounted geoprobe drill rig. Each of the 7 geobrobe borings will be advanced to depths ranging from 5 to feet below the existing ground surface.
Date:  June 11, 2014

Client: Mr. Dodd Walker Akridge | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400330
2014/06/110651002 M St Nw, Washington, Dc 20001Stephen Patt Ecs Midatlantic, Llc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.