Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Date: December 9, 2002 Permit id: 02-12-036 | Parcel: 010550001000 | |||||
Date: February 21, 2003 Permit id: 03-02-091 | |||||
Date: March 31, 2004 Permit id: 04-03-299 | Parcel: 010550005000 | |||||
Date: September 21, 2006 Permit id: 06-09-215 | Parcel: 010550005000 | |||||
Date: June 7, 2010 Permit id: 10-06-024 | Parcel: 010550005000 | |||||
Date: August 1, 2011 Permit id: 11-08-006 | Parcel: 010550005000 | |||||
Date: June 6, 2012 Permit id: 12-06-027 | Parcel: 010550005000 | |||||
Date: May 23, 2013 Permit id: 13-05-108 | Parcel: 010550005000 | |||||
99022 (pm#30298700) install new pole. Install cable in existing conduit. Allwork shall comply with city standards and details. Date: May 12, 2003 Permit id: 03-0485 | |||||
SCORE 61 Grading and storm drain only with this permit. Owner to provide certification of building pad to building division. All city standards and general notes will apply to this grading permit. Date: January 28, 2003 Contractor: Buntain Construction Permit id: 03-0112 | |||||
SCORE 61 Revised permit - 8 11 03russian baptist church. Modifications to improvement plans shall be addressed on the plans and completed prior to certificate of occupancy. All work shall conform to city standards. Date: January 31, 2003 Contractor: Buntain Construction Permit id: 03-0141 | |||||
SCORE 99 Install fire protection sys Date: February 21, 2003 Contractor: Mr Sprinkler Permit id: 03-0231 | |||||
Event parking next door to church. All work shall comply with city standards and ordinances. Date: September 20, 2005 Permit id: 05-1354 | Parcel: 010550005000 | |||||
Wo#99003 at&t job#7741817 - "project light speed" location: 10 sacramento ave. Excavate and install at&t conduits, equipment and power conduits to provision a new at&t electronics cabinet. A pre-construction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal condition or better. Date: May 28, 2010 Permit id: 10-0194 | Parcel: 010550005000 | |||||
Bore to place 321 of (2) 2" hdpe conduit for fiber service. Date: May 26, 2011 Permit id: 11-0112 | Parcel: 010550005000 | |||||
SCORE 56 1. Modify ramp at the cormer of sacramento aven and jefferson blvd. 2. All work within the right-of-way shall be constructed per state and federal accessibility standards. 3. A preconstruction meeting is required call (916) 617-4692. 4. All work shall comply with city standards and details. 5. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal condition or better. Change of use for 2,987sf of existin Date: August 2, 2011 Contractor: Calpo Horn And Dong Architects Permit id: 11-0162 | Parcel: 010550005000 | |||||
Convert existing church area for use as charter school (2,134sf) Date: June 7, 2012 Permit id: 12-0144 | Parcel: 010550005000 | |||||
Level3 #12073install (1) 4" hdpe conduit with tracer wire f o cable. Pull 9. F o cable. Splice fiber. All work within the right-of-way shall be constructed per state and federal accessibility standards. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal condition or better. Trench and plac Date: November 20, 2012 Permit id: 12-0327 | Parcel: 010550005000 |