ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Interior renovation my eye dr. Date: February 7, 2012Client: Washington Square Limited Partnership | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1204696 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildjkm1me%2foukz3po9twain4 Date: July 25, 2012Client: Lerner Enterprises | Applicant: David Raine; Lerner Enterprises; David Raine | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P27303126 | |||||
Replace existing fire pump, jockey pump,fire pump controller and jockey pump controller. Date: October 5, 2012Client: Lerner Corp | Applicant: Lerner Corp; David Howell | Permit type: Addition alteration | Permit status: Permit issued | Permit id: B1213474 | |||||
Renovations to existing 11th and 12th floor office space for baker hostetler, scope of work on 11th floor is new unisex restroom,approx. 3 sq. Ft, and renovations to offices on the 12th floor, approx 20,158 sq. Ft. All as shown on the attached building plans. Interior work only. Date: October 3, 2012Client: Lerner | Applicant: Lerner; John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1211818 | |||||
Replacement of ahus on the 5th floor, installation of new mechanical systems, demolition of interconnecting stairs and slab infill 5th, 6th and 7th floors. Date: December 20, 2012Client: Anna Diperna Trustee | Applicant: Lerner Corporation | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1300638 | |||||
Replacement of ahus on 4th. Floor, installation of new mechanical systems, demolition of 5th. Floor improvements, installation of demising walls on 5th. Floor, interconnecting stair removal 4, 5, 6 and slab infill. Date: December 20, 2012Client: Anna Diperna Trustee | Applicant: Washington Square, Ltd, Ptp; Lerner Corporation | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1214414 | |||||
Revision to bldg. Permit b1214485 to show changes to mechanical plans and to electrical plan as per the attached revised m. 01, m. 02 and e4. 02 dwgs. And written description of changes. Interior work only for aba. No architectural, plumbing, or fire protection changes. Date: November 1, 2012Client: American Bar Association | Applicant: Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1301024 | |||||
Interior demolition of 10th floor office space. Not structural Date: August 13, 2012Client: Washington Square Limited Partnership | Applicant: Sam Hollen | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200959 | |||||
After hours for paver replacement 6/25/12 to 7/14/12 mon thru sat 5am to 7pm permit # pa69974 Date: June 26, 2012Client: Washington Square Limited Partnership | Applicant: Marty Nifratki | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200605 | |||||
Meter valve replacement in pit under sidewalk Date: July 3, 2012Client: Washington Sq Limited P Partnership | Applicant: Washington Sq L P Partnership; Mike Gurwitz | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200627 | |||||
Installation of the following wall mounted signs sign a front elevation internally illuminated aluminun face wall cabinet 9ft. X2ft. Total of 18 sq. Ft. Sign b front elevation non illuminated pan channel letters 5ft. 7 3/4 in. X 1ft. 13/4in. Total of 6. 47sq. Ft. Sign c1 and c2 vinyl layout on existing balconies glass. 4ft. 11 1/4in x 1ft. Total of 4. 94 ea. Sq ft. Total sq. Ft. Of all signage is 34. 35 sq. Ft. Signage is replacement of existing signage for mortons the steakhouse Date: September 11, 2012Client: Anna Diperna Trustee | Applicant: Lerner Corp. Washington Square Ltd. Partnership,; Bob Wallace Danten Permit Service; Wm Electrical S | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1200495 | |||||
Install new stainless steel cladding over existing metal cladding at metro security gate enclosure on basement. Change finish from bronze to stainless stain. Replace 2 existing signs which each is less than 25 square foot in size. Wmata has reviewed and approved the alteration. Letter approval is attached. Date: May 7, 2012Client: Washington Square Limited Partnership | Applicant: Lerner Corp, . | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1208408 | |||||
Renew of permit b1105148 as per existing permit renovation to11th fl east and west restroom,12th fl west restroom and tenant space on both 11th and 12th fl with nee convenices stairs beong constructed. All per attached plans interior work only. Date: June 29, 2012Client: Washington Square Limited Partnership | Applicant: Washington Square Limited Partnersh | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1210971 | |||||
Renovations to existing office space on the 4th and 5th floors, american bar association as shown on the attached mep, fire protection and architectural dwgs. Interior work only. Date: October 31, 2012Client: American Bar Association | Applicant: American Bar Association; John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1214485 | |||||
Interior renovation of the existing entrance and lobby area of an existing restaurant including replacement of existing lighting fixtures, carpeting, upholstery, ceilings and walls. No plumbing, no hvac. No change of use. No change to current occupancy of 303 seats 396 max occupancy. Date: August 16, 2012Client: Mortons Steakhouse | Applicant: Mortons Steakhouse; Joe Spinelli Restaurant Consultants | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1212698 | |||||
Electrical Date: July 12, 2012Client: Washington Square Limited Partnership | Applicant: Craig A. Llewellyn | Permit status: Completed | Permit id: E1207611 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildorznafkpquuiyzexwugjd Date: July 30, 2012Applicant: Gordon Williams; Washington Squa Washington Square Ltd Partnership; Gordon Williams | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P13052846 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcqg1tz5p%2b1pcda78nmyza1 Date: October 17, 2012Client: Lerner Corp Trust | Applicant: Cliff Collins; Lerner Corp Trust; Robert Dike | Permit type: Electrical | Permit status: Permit issued | Permit id: E37657665 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildby1xcmnz2ddb0rockw43k Date: April 12, 2012Client: Lerner Enterprise | Applicant: Annoria Wong; Lerner Enterprise; Christopher Schulze | Permit type: Mechanical | Permit status: Completed | Permit id: Ar71263978 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeiledqi21ibegscck%2bvl%2bffbk Date: December 12, 2012Client: Washington Square Limited | Applicant: Richard Collins; Washington Squa Limited; Robert Dike | Permit type: Electrical | Permit status: Permit issued | Permit id: E72156507 | |||||
Plumbing and gas Date: February 8, 2013Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1302757 | |||||
Interior renovation to concourse level elevator lobby. Partitions, finishes, mechanical, electrical and life safety. Date: September 18, 2013Client: Lerner Corp | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1310912 | |||||
Non structural partition wall demolition to the 6th floor. Date: June 3, 2013Client: Maria C Tripoli | Applicant: Fvi 20/20 | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300561 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilc5szjogaxc13xoym12gdy5 Date: June 28, 2013Client: Washington Square Lerner Group | Applicant: Patrick Barron; Washington Squa Lerner Group; Robin Malley | Permit type: Electrical | Permit status: Permit issued | Permit id: E41031833 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcprotncshjjuoni6i%2bdsr%2f Date: May 15, 2013Client: Washington Square Llp Lerner Corp | Applicant: Annoria Wong; Washington Squa Lerner Corp; Christopher Schulze | Permit type: Mechanical | Permit status: Completed | Permit id: Ar98982470 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilc8zxh6hjn%2bobg6ubdt1phm Date: May 15, 2013Client: Washington Sq Llp | Applicant: Andrew Arntson; Washington Sq Llp; Andrew Arntson | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P94828391 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildy6xvsc7y1h32sdjkewidv Date: May 22, 2013Client: Lerner Corporation | Applicant: Bernard Kalb; Lerner Corporation; Bernard Kalb | Permit type: Electrical | Permit status: Completed | Permit id: E88613387 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilemlvij383v57ru5trv5lok Date: July 12, 2013Client: Washington Square Llp- Lerner Corp | Applicant: Bernard Kalb; Washington Squa Lerner Corp; Bernard Kalb | Permit type: Electrical | Permit status: Completed | Permit id: E95178143 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcbmoxvhecilikeytqevzld Date: August 23, 2013Client: Washington Squre Lerner Corp | Applicant: Bernard Kalb; Washington Squr Lerner Corp; Bernard Kalb | Permit type: Electrical | Permit status: Completed | Permit id: E71187667 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilderlm6rdqtxu2v12rlb22z Date: July 13, 2013Client: Maria C Tripoli Leaner Corp | Applicant: Rosemary Hoyle; Maria C Tripoli Leaner Corp; Paul Warren | Permit type: Electrical | Permit status: Permit issued | Permit id: E55861939 | |||||
Interior renovation to 1st floor tenant space to create two tenants. New demising partition, mep and life safety work. Landlord upgrades. Tenant work under separate permit. Suites 1. 20/1. 21/1. 23 Date: February 4, 2013Client: Washington Square, Llp Lerner Corp. | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1303297 | |||||
Interior renovation to 3rd floor office space. Partitions, mechanical, electrical and life safety. Gibson, dunn and crutcher, llp Date: January 22, 2013Client: Washington Square, Llp Lerner Corp. | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1303299 | |||||
Interior renovation to 8th floor office space. Partitions, mep and life safety. New structural convenience stair up to 9th floor. Gibson, dunn ? Crutcher, llp Date: February 8, 2013Client: Lerner Corporation | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1302256 | |||||
Interior renovation to 10th floor office space. Partitions, mep and life safety. Spec suites 1080/1090 Date: April 3, 2013Client: Washington Square, Llp Lerner Corporation | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1302979 | |||||
Interior renovation to 10th floor office space. Partitions, mep and life safety. Spec suites 1060/1070 Date: April 3, 2013Client: Washington Square, Llp Lerner Corporation | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1302980 | |||||
Interior renovation to 2nd and 3rd floor office space. Partitions, mechanical, electrical and life safety. Gibson, dunn and crutcher, llp Date: March 20, 2013Client: Wahington Square, Llp Lerner Corp. | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1304433 | |||||
Interior renovations to restrooms and corridors on floors 4, 5, 6, 7 and 10. New finishes, fixtures, mep and life safety. Date: March 26, 2013Client: Washington Square Limited Partnership, Llplerner | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1303810 | |||||
Interior renovation to 6th floor elevator lobby and corridor. New finishes, mechanical, electrical and life safety. Date: December 17, 2014Client: Washington Square Limited Partnership, Llp | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1502038 | |||||
Plumbing and gas Date: September 19, 2014Client: Maria C Tripoli | Permit status: Completed | Permit id: P1408700 | |||||
Renovation to existing mens hair salon on the lower level of washington square. New storefront, flooring and paint. Replace existing light fixtures including emergency. Adding two track lights (new). No mechanical and no life safety changes. Washington square mens salon, inc. Date: January 27, 2014Client: Maria C Tripoli | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1402804 | |||||
Interior renovations on 6th and 7th floors hvac system upgrade to include new vavs, new ductwork and elimination of perimeter heat pumps. Electrical and life safety. Aba landlord work. Date: April 1, 2014Client: Washington Square Limited Partnership, Lp | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1403968 | |||||
Install one foot flagpole, building column mounted at a 45 degree angle. Date: June 26, 2014Client: Maria C Tripoli | Applicant: Jopatric Love - Americode | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1408858 | |||||
Interior renovation to 6th floor office space. Partitions, furniture, mep, life safety and structural. Manatt Date: October 14, 2014Client: Washington Square Limited Partnership | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1411205 | |||||
Interior renovation to 8th floor office space. Partitions, furniture, mechanical, electrical and life safety. Gibson, dunn and crutcher, llp Date: August 7, 2014Client: Lerner Corporation | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1410632 | |||||
Interior renovation to concourse level service corridor and restrooms. New finishes, fixtures, mep and life safety. Date: September 17, 2014Client: Washington Square Limited Partnership, Llp | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1412039 | |||||
Interior renovation to 10th floor office space. Partitions, finishes, mechanical, electrical and life safety. Suite 1090 Date: November 21, 2014Client: Washington Square Limited Partnership, Llp | Applicant: Sam Hollen Ramco Of Dc, Inc | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1501019 | |||||
Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: July 14, 2014Applicant: William Hart | Permit type: Building | Permit status: Permit issued | Permit id: Pc42945760 | |||||
After hours permit for b1408858 from 10/14/2014 to 10/21/2014 4am-6am and 7pm-9pm Date: October 14, 2014Client: Lerner Corp. | Applicant: Jopatric Love - Americode | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500033 | |||||
Placing inner duct between existing verizon manholes. July 11, 2014 û august 11, 2014, 7pm û 2am. And saturday only. Date: July 14, 2014Client: Comcast Cable | Applicant: Michael Sonesen | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400574 | |||||
After hours work permit in conjunction with b1410632 interior 8th floor office permit. 7pm to 4am monday through friday. Date: September 10, 2014Client: Lerner Corporation | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400683 | |||||
An after hours permit is respectfully requested from 4am saturday thru 9pm sunday Date: June 6, 2014Client: Crane Service Co | Applicant: Christine Long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400499 | |||||
After hours permit for b1408858 from 10/22/2014 to 10/31/2014 3am to 7am Date: October 22, 2014Client: Lerner Corp. | Applicant: Jopatric Love - Americode | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500043 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilemm8dzco2u%2ffxiaq41nc%2fs Date: November 5, 2014Client: Lerner Corporation | Applicant: Michael Jamison; Lerner Corporation; Scott Broadbent | Permit type: Electrical | Permit status: Completed | Permit id: E17021746 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild73ov0wej6oiamcy%2fxy3va Date: November 20, 2014Client: Leaner Corporation | Applicant: Jeff Wetzel; Leaner Corporation; Wayne Reep | Permit type: Electrical | Permit status: Completed | Permit id: E28463453 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfyd1ixlbiz08e6q6xpzffg Date: November 14, 2014Client: Leaner Corporation | Applicant: Dynalectric Company; Leaner Corporation; Wayne Reep | Permit type: Electrical | Permit status: Completed | Permit id: E44280908 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfmd%2fqecn3t8wyfchryo00e Date: December 11, 2014Client: Washington Square Limited Partnership | Applicant: George Hockaday-Bey; Washington Squa Limited Partnership; George Hockaday-Bey | Permit type: Electrical | Permit status: Permit issued | Permit id: E13174710 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilee9njywu50yev9r7jrus8e Date: September 13, 2014Client: Unknown Unknown | Applicant: Patrick Barron; Unknown Unknown; Robin Malley | Permit type: Electrical | Permit status: Permit issued | Permit id: E84952919 | |||||
Interior renovation to extend condenser water system in base building. Mep and structural reinforcement. Piping on roof. Date: July 14, 2014Client: Washingon Square Limiited Partnership | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1406769 | |||||
Plumbing and gas Date: October 28, 2015Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1600828 | |||||
Interior renovation to 6th floor office space. Partitions, finishes, mechanical, electrical and life safety. 4626 square feet. Manatt Date: September 17, 2015Client: Maria C Tripoli | Applicant: Sam Hollen Ramco Of Dc, Inc. | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1509898 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilf7e%2fegyy6mpekhdnykmmfl Date: October 31, 2015Client: Sam Hollen | Applicant: Michael Heisey; Sam Hollen; Robert Watts | Permit type: Electrical | Permit status: Permit issued | Permit id: E76976923 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeileni2e9cumuunlgbgm6jh9h Date: December 9, 2015Client: Lerner Lerner | Applicant: Lerner Lerner; Lerner Lerner; Joseph Richards | Permit type: Electrical | Permit status: Completed | Permit id: E71476071 | |||||
To work after hours,8pm to 7am until 11/23/2012 Date: November 2, 2012Client: Gibson, Dunn ? Crutcher Llp | Applicant: Rand Construction Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300093 | |||||
Interior demo of the 8th floor Date: November 2, 2012Client: Lerner | Applicant: Rand Construction Company | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300074 | |||||
Plumbing and gas Date: December 4, 2012Client: Anna Diperna Trustee | Applicant: Jay H Schwab | Permit status: Completed | Permit id: P1301445 | |||||
Plumbing and gas Date: May 20, 2013Client: Maria C Tripoli | Applicant: Rob Hohl | Permit status: Completed | Permit id: P1305106 | |||||
Plumbing and gas Date: May 20, 2013Client: Maria C Tripoli | Applicant: Rob Hohl | Permit status: Completed | Permit id: P1305107 | |||||
Plumbing and gas Date: April 26, 2013Client: Washington Square, Llp | Permit status: Completed | Permit id: P1304572 | |||||
Electrical Date: March 18, 2013Client: Maria C Tripoli | Applicant: Frank V Cantwell | Permit status: Completed | Permit id: E1303818 | |||||
Electrical Date: March 1, 2013Client: Maria C Tripoli | Applicant: Robin R. Malley | Permit status: Completed | Permit id: E1303468 | |||||
Mechanical Date: February 4, 2013Client: Maria C Tripoli | Applicant: 09/30/2012 | Permit status: Completed | Permit id: M1300877 | |||||
Mechanical Date: February 4, 2013Client: Maria C Tripoli | Applicant: 09/30/2012 | Permit status: Completed | Permit id: M1300878 | |||||
Plumbing and gas Date: May 6, 2013Client: Maria C Tripoli | Applicant: Neftali D. Vasquez | Permit status: Completed | Permit id: P1304790 | |||||
Revision to issued permit b1409248 for changes to office layout. Original permit was issued for alterations to 49,0 sf of existing office space. Date: November 4, 2014Client: Mmc Res Finance And Admin | Applicant: David Fontana Mckeever Services Corp | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1410439 | |||||
Interior only alteration to 49,0 sf of existing office space. New partition plan and associated mep included. Date: July 11, 2014Client: Maria C Tripoli | Applicant: Evan Obrien/ D Mckeever Services | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1409348 | |||||
Plumbing and gas Date: July 30, 2014Client: Maria C Tripoli | Permit status: Completed | Permit id: P1407419 | |||||
Electrical Date: July 23, 2014Client: Maria C Tripoli | Applicant: Herbert D Laut | Permit status: Permit issued | Permit id: E1407456 | |||||
Mechanical Date: October 22, 2014Client: Maria C Tripoli | Applicant: W.E. Bowers | Permit status: Completed | Permit id: M1500206 | |||||
Plumbing and gas Date: May 15, 2014Client: Maria C Tripoli | Permit status: Completed | Permit id: P1405556 | |||||
Plumbing and gas Date: October 29, 2014Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1500782 | |||||
Plumbing and gas Date: October 30, 2014Client: Maria C Tripoli | Applicant: Rick Myers | Permit status: Permit issued | Permit id: P1500847 | |||||
Plumbing and gas Date: May 15, 2014Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1405557 | |||||
SCORE 96 Mechanical Date: December 4, 2012 Contractor: Wayne E. BowersClient: Anna Diperna Trustee | Permit status: Completed | Permit id: M1300475 | |||||
SCORE 96 Plumbing and gas Date: December 4, 2012 Contractor: Jay H SchwabClient: Anna Diperna Trustee | Permit status: Completed | Permit id: P1301445 | |||||
SCORE 96 Mechanical Date: December 4, 2012 Contractor: Wayne E. BowersClient: Anna Diperna Trustee | Permit status: Completed | Permit id: M1300475 | |||||
SCORE 96 Plumbing and gas Date: December 4, 2012 Contractor: Jay H SchwabClient: Anna Diperna Trustee | Permit status: Completed | Permit id: P1301445 | |||||
SCORE 96 Mechanical Date: December 4, 2012 Contractor: Wayne E. BowersClient: Anna Diperna Trustee | Permit status: Completed | Permit id: M1300475 | |||||
SCORE 96 Plumbing and gas Date: December 4, 2012 Contractor: Jay H SchwabClient: Anna Diperna Trustee | Permit status: Completed | Permit id: P1301445 | |||||
SCORE 56 Replacement of ahus on 4th. Floor, installation of new mechanical systems, demolition of 5th. Floor improvements, installation of demising walls on 5th. Floor, interconnecting stair removal 4, 5, 6 and slab infill. Date: December 20, 2012 Contractor: Washington Square Ltd Ptp; Lerner CorporationClient: Anna Diperna Trustee | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1214414 | |||||
SCORE 56 Replacement of ahus on 4th. Floor, installation of new mechanical systems, demolition of 5th. Floor improvements, installation of demising walls on 5th. Floor, interconnecting stair removal 4, 5, 6 and slab infill. Date: December 20, 2012 Contractor: Washington Square Ltd Ptp Lerner CorporationClient: Anna Diperna Trustee | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1214414 | |||||
SCORE 56 Replacement of ahus on 4th. Floor, installation of new mechanical systems, demolition of 5th. Floor improvements, installation of demising walls on 5th. Floor, interconnecting stair removal 4, 5, 6 and slab infill. Date: December 20, 2012 Contractor: Washington Square, Ltd, Ptp; Lerner CorporationClient: Anna Diperna Trustee | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1214414 | |||||
Interior demo of the 8th floor Date: November 2, 2012Client: Lerner | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300074 | |||||
To work after hours,8pm to 7am until 11/23/2012 Date: November 2, 2012Client: Gibson, Dunn ? Crutcher Llp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300093 | |||||
To work after hours,8pm to 7am until 11/23/2012 Date: November 2, 2012Client: Gibson, Dunn ? Crutcher Llp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300093 | |||||
Interior demo of the 8th floor Date: November 2, 2012Client: Lerner | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300074 | |||||
SCORE 100 Interior demo of the 8th floor Date: November 2, 2012 Contractor: Rand Construction CompanyClient: Lerner | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300074 | |||||
SCORE 100 To work after hours,8pm to 7am until 11 23 2012 Date: November 2, 2012 Contractor: Rand Construction CompanyClient: Gibson, Dunn ? Crutcher Llp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300093 | |||||
SCORE 96 Electrical Date: May 17, 2013 Contractor: Herbert D LautClient: Maria C Tripoli | Permit status: Completed | Permit id: E1305371 | |||||
SCORE 93 Plumbing and gas Date: May 20, 2013 Contractor: Rob HohlClient: Maria C Tripoli | Permit status: Completed | Permit id: P1305106 | |||||
SCORE 96 Electrical Date: May 17, 2013 Contractor: Herbert D LautClient: Maria C Tripoli | Permit status: Completed | Permit id: E1305371 | |||||
SCORE 93 Plumbing and gas Date: May 20, 2013 Contractor: Rob HohlClient: Maria C Tripoli | Permit status: Completed | Permit id: P1305106 | |||||
SCORE 96 Electrical Date: May 17, 2013 Contractor: Herbert D LautClient: Maria C Tripoli | Permit status: Completed | Permit id: E1305372 | |||||
SCORE 93 Plumbing and gas Date: May 20, 2013 Contractor: Rob HohlClient: Maria C Tripoli | Permit status: Completed | Permit id: P1305107 | |||||
SCORE 96 Electrical Date: May 17, 2013 Contractor: Herbert D LautClient: Maria C Tripoli | Permit status: Completed | Permit id: E1305372 | |||||
SCORE 93 Plumbing and gas Date: May 20, 2013 Contractor: Rob HohlClient: Maria C Tripoli | Permit status: Completed | Permit id: P1305107 | |||||
SCORE 92 Electrical Date: March 1, 2013 Contractor: Robin R. MalleyClient: Maria C Tripoli | Permit status: Completed | Permit id: E1303468 | |||||
SCORE 92 Electrical Date: March 1, 2013 Contractor: Robin R. MalleyClient: Maria C Tripoli | Permit status: Completed | Permit id: E1303468 | |||||
SCORE 92 Electrical Date: March 1, 2013 Contractor: Robin R. MalleyClient: Maria C Tripoli | Permit status: Completed | Permit id: E1303468 | |||||
SCORE 84 Mechanical Date: February 4, 2013 Contractor: 09 30 2012Client: Maria C Tripoli | Permit status: Completed | Permit id: M1300877 | |||||
SCORE 84 Mechanical Date: February 4, 2013 Contractor: 09 30 2012Client: Maria C Tripoli | Permit status: Completed | Permit id: M1300877 | |||||
SCORE 84 Mechanical Date: February 4, 2013 Contractor: 09 30 2012Client: Maria C Tripoli | Permit status: Completed | Permit id: M1300877 | |||||
SCORE 84 Mechanical Date: February 4, 2013 Contractor: 09 30 2012Client: Maria C Tripoli | Permit status: Completed | Permit id: M1300878 | |||||
SCORE 96 Mechanical Date: August 7, 2015 Contractor: Timothy L PepperClient: Maria C Tripoli | Permit status: Completed | Permit id: M1502914 | |||||
SCORE 84 Mechanical Date: February 4, 2013 Contractor: 09 30 2012Client: Maria C Tripoli | Permit status: Completed | Permit id: M1300878 | |||||
SCORE 84 Mechanical Date: February 4, 2013 Contractor: 09 30 2012Client: Maria C Tripoli | Permit status: Completed | Permit id: M1300878 | |||||
SCORE 96 Mechanical Date: August 7, 2015 Contractor: Timothy L PepperClient: Maria C Tripoli | Permit status: Completed | Permit id: M1502914 | |||||
Plumbing and gas Date: April 26, 2013Client: Washington Square, Llp | Permit status: Completed | Permit id: P1304572 | |||||
Plumbing and gas Date: April 26, 2013Client: Washington Square, Llp | Permit status: Completed | Permit id: P1304572 | |||||
Plumbing and gas Date: April 26, 2013Client: Washington Square, Llp | Permit status: Completed | Permit id: P1304572 | |||||
SCORE 56 Installation of the following wall mounted signs sign a front elevation internally illuminated aluminun face wall cabinet 9ft. X2ft. Total of 18 sq. Ft. Sign b front elevation non illuminated pan channel letters 5ft. 7 3/4 in. X 1ft. 13/4in. Total of 6. 47sq. Ft. Sign c1 and c2 vinyl layout on existing balconies glass. 4ft. 11 1/4in x 1ft. Total of 4. 94 ea. Sq ft. Total sq. Ft. Of all signage is 34. 35 sq. Ft. Signage is replacement of existing signage for mortons the steakhouse Date: September 11, 2012Client: Anna Diperna Trustee | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1200495 | |||||
SCORE 89 Electrical Date: July 12, 2012 Contractor: Craig A. LlewellynClient: Washington Square Limited Partnership | Permit status: Completed | Permit id: E1207611 | |||||
SCORE 93 Electrical Date: November 6, 2012 Contractor: Marion C DeanClient: Anna Diperna Trustee | Permit status: Completed | Permit id: E1300889 | |||||
SCORE 96 Electrical Date: October 5, 2012 Contractor: Bernard G KalbClient: Anna Diperna Trustee | Permit status: Completed | Permit id: E1300194 | |||||
SCORE 96 Electrical Date: October 10, 2012 Contractor: Philip G DonnellyClient: Anna Diperna Trustee | Permit status: Completed | Permit id: E1300280 | |||||
Electrical Date: January 31, 2012Client: Washington Square Limited Partnership | Permit status: Permit issued | Permit id: E1203079 | |||||
SCORE 96 Electrical Date: December 11, 2012 Contractor: Michael F. DuganClient: Anna Diperna Trustee | Permit status: Permit issued | Permit id: E1301657 | |||||
SCORE 100 Plumbing and gas Date: October 31, 2012 Contractor: John McdonaldClient: Anna Diperna Trustee | Permit status: Permit issued | Permit id: P1300670 | |||||
SCORE 96 Plumbing and gas Date: May 4, 2012 Contractor: Robert W. ParsonsClient: Washington Square Limited Partnership | Permit status: Permit issued | Permit id: P1204969 | |||||
SCORE 61 Plumbing and gas Date: October 5, 2012 Contractor: Bill SaunderClient: Anna Diperna Trustee | Permit status: Permit issued | Permit id: P1300129 | |||||
Interior renovation my eye dr. Date: February 7, 2012Client: Washington Square Limited Partnership | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1204696 | |||||
SCORE 96 Plumbing and gas Date: October 18, 2012 Contractor: Richard V CareyClient: Anna Diperna Trustee | Permit status: Completed | Permit id: P1300422 | |||||
Plumbing and gas Date: February 8, 2013Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1302757 | |||||
SCORE 96 Plumbing and gas Date: February 19, 2013 Contractor: Thomas A KelleherClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1302952 | |||||
Plumbing and gas Date: May 16, 2013Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1304927 | |||||
SCORE 96 Electrical Date: February 28, 2013 Contractor: Michael F. DuganClient: Maria C Tripoli | Permit status: Completed | Permit id: E1303435 | |||||
SCORE 96 Electrical Date: April 22, 2013 Contractor: Jin Joon HuhClient: Maria C Tripoli | Permit status: Completed | Permit id: E1304698 | |||||
SCORE 96 Electrical Date: February 5, 2013 Contractor: Michael F. DuganClient: Maria C Tripoli | Permit status: Completed | Permit id: E1302822 | |||||
SCORE 96 Electrical Date: January 28, 2013 Contractor: David C. WilliamsClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1302634 | |||||
SCORE 86 Mechanical Date: June 17, 2013 Contractor: James F BrownClient: Maria C Tripoli | Permit status: Completed | Permit id: M1302016 | |||||
SCORE 89 Plumbing and gas Date: February 14, 2013 Contractor: Shaw HergenratherClient: Maria C Tripoli | Permit status: Completed | Permit id: P1302902 | |||||
SCORE 89 Plumbing and gas Date: February 26, 2013 Contractor: Shaw HergenratherClient: Mario Tripoli | Permit status: Completed | Permit id: P1303125 | |||||
SCORE 93 Plumbing and gas Date: April 23, 2013 Contractor: Kenneth C. HarrisClient: Maria C Tripoli | Permit status: Completed | Permit id: P1304456 | |||||
Plumbing and gas Date: April 15, 2013Client: Maria C Tripoli | Permit status: Completed | Permit id: P1304267 | |||||
SCORE 98 Plumbing and gas Date: November 7, 2014 Contractor: David FlemingPermit status: Completed | Permit id: P1501056 | |||||
Plumbing and gas Date: September 19, 2014Client: Maria C Tripoli | Permit status: Completed | Permit id: P1408700 | |||||
SCORE 96 Electrical Date: October 16, 2014 Contractor: Dennis R. WoodeClient: Maria C Tripoli | Permit status: Completed | Permit id: E1500407 | |||||
SCORE 96 Electrical Date: May 8, 2014 Contractor: Herbert D LautClient: Maria C Tripoli | Permit status: Completed | Permit id: E1405476 | |||||
SCORE 96 Electrical Date: November 12, 2014 Contractor: John H ThomsonPermit status: Completed | Permit id: E1501008 | |||||
SCORE 93 Electrical Date: July 22, 2014 Contractor: Floyd D ConnellyClient: Maria C Tripoli | Permit status: Completed | Permit id: E1407421 | |||||
SCORE 93 Electrical Date: February 19, 2014 Contractor: Frank V CantwellClient: Maria C Tripoli | Permit status: Completed | Permit id: E1403380 | |||||
SCORE 96 Electrical Date: September 9, 2014 Contractor: John H ThomsonPermit status: Permit issued | Permit id: E1408848 | |||||
SCORE 96 Electrical Date: October 9, 2014 Contractor: Philip G DonnellyClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1500247 | |||||
SCORE 96 Electrical Date: October 9, 2014 Contractor: Gregory E LigonPermit status: Permit issued | Permit id: E1500256 | |||||
SCORE 96 Mechanical Date: July 17, 2014 Contractor: Christos T SakkosClient: Maria C Tripoli | Permit status: Completed | Permit id: M1402604 | |||||
SCORE 96 Mechanical Date: May 30, 2014 Contractor: Wayne E. BowersClient: Maria C Tripoli | Permit status: Permit issued | Permit id: M1401985 | |||||
SCORE 96 Plumbing and gas Date: July 17, 2014 Contractor: Christos T. SakkosClient: Maria C Tripoli | Permit status: Completed | Permit id: P1407062 | |||||
SCORE 96 Mechanical Date: July 25, 2014 Contractor: Wayne E. BowersClient: Mario Tripoli | Permit status: Permit issued | Permit id: M1402703 | |||||
Plumbing and gas Date: September 17, 2014Permit status: Permit issued | Permit id: P1408657 | |||||
Plumbing and gas Date: February 19, 2014Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1403358 | |||||
SCORE 98 Plumbing and gas Date: October 6, 2014 Contractor: David FlemingPermit status: Permit issued | Permit id: P1500150 | |||||
SCORE 93 Interior renovations to concourse, 5th and 10th floor elevator lobbies. New finishes, mechanical, electrical and life safety. Date: April 9, 2015 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1503805 | |||||
SCORE 98 Install 2-flat metal panels - routed out letters w/ plastic cutouts. Date: April 6, 2015 Contractor: NonePermit type: Sign | Permit status: Permit issued | Permit id: Sg1500210 | |||||
SCORE 96 Electrical Date: January 2, 2015 Contractor: David C. WilliamsClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1502210 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildsrti55o62ljh7uulxk6db Date: February 18, 2015Client: Washington Square Limited Partnership, Llp | Permit type: Electrical | Permit status: Completed | Permit id: E68153203 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcf%2fnrjrgp%2b38yjfejn4qgk Date: September 17, 2015Client: Washington Square Limited Partnership, Llp | Permit type: Electrical | Permit status: Completed | Permit id: E60925143 | |||||
SCORE 93 Interior renovation to 5th floor office space. Partitions, furniture, mep and life safety. 29,893 square feet. Regus 0402 Date: August 4, 2015 Contractor: Sam Hollen Ramco Of Dc IncClient: Maria C Tripoli | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1504936 | |||||
SCORE 93 Interior renovation to 11th floor lunch room. New millwork, finishes, electrical and life safety. No mechanical. Replacement in kind of plumbing fixture. Baker and hostetler Date: June 29, 2015 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Assoc Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1509362 | |||||
SCORE 96 Plumbing and gas Date: August 7, 2015 Contractor: Thomas A KelleherClient: Maria C Tripoli | Permit status: Completed | Permit id: P1508080 | |||||
SCORE 89 Plumbing and gas Date: August 12, 2015 Contractor: Shaw HergenratherClient: Maria C Tripoli | Permit status: Completed | Permit id: P1508208 | |||||
SCORE 93 Interior renovation to 10th floor office space. Partitions, mechanical, electrical and life safety. 15 sq feet. The arab gulf states institute in washington suite 1060 Date: June 11, 2015 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1508654 | |||||
SCORE 96 Electrical Date: August 27, 2015 Contractor: Herbert D LautClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1508812 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild0mljpr3ekd4pntenjys%2bk Date: March 3, 2015Client: Washington Square Limited Partnership, Llp | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P94457354 | |||||
SCORE 93 After hours work permit in conjunction with b1503805. Interior lobby renovations. 7pm to 7am monday through saturday. Start 9-3-15 end 10-3-15. Date: September 3, 2015 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Limited Partnership,Llp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500727 | |||||
SCORE 93 Interior renovation to 10th floor office space. Partitions, furniture, mep and life safety. 4788 square feet. Spec suite Date: September 15, 2015 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1510861 | |||||
SCORE 93 Plumbing and gas Date: December 23, 2015 Contractor: Matt LosignorClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1602405 | |||||
SCORE 93 After hours work permit in conjunction with b1503805. 7pm to 7am. Monday through saturday. Start 10-5-15. End 11-5-15 Date: October 5, 2015 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Limited Partnership, Llp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600008 | |||||
SCORE 76 Electrical Date: September 29, 2015 Contractor: Aschalew AsaminewClient: Maria C Tripoli | Permit status: Completed | Permit id: E1509746 | |||||
SCORE 93 After hours work permit in conjunction with b1509898. Interior 6th floor office renovation. 7pm to 7am monday through saturday. Start 9-18-15 end 10-18-15. Date: September 18, 2015 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Associates Limited Partnership, Llp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500774 | |||||
SCORE 93 Interior renovation to 6th floor office space. Partitions, finishes, mechanical, electrical and life safety. 4626 square feet. Manatt Date: September 17, 2015 Contractor: Sam Hollen Ramco Of Dc IncClient: Maria C Tripoli | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1509898 | |||||
Plumbing and gas Date: October 28, 2015Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1600828 | |||||
SCORE 96 Plumbing and gas Date: October 28, 2015 Contractor: Jay W LippClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1600831 | |||||
SCORE 93 Plumbing and gas Date: September 25, 2015 Contractor: Rob HohlClient: Maria C Tripoli | Permit status: Completed | Permit id: P1509367 | |||||
SCORE 96 Plumbing and gas Date: October 7, 2015 Contractor: Christos T. SakkosClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1600181 | |||||
Plumbing and gas Date: January 19, 2016Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1602976 | |||||
SCORE 89 Electrical Date: January 7, 2016 Contractor: Orlando M CatanaClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1602634 | |||||
SCORE 86 Mechanical Date: March 17, 2016 Contractor: Brandon K ViernesClient: Maria C Tripoli | Permit status: Permit issued | Permit id: M1601451 | |||||
SCORE 79 Electrical Date: June 1, 2016 Contractor: Jeffrey M. YinglingClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1606846 | |||||
SCORE 93 Plumbing and gas Date: September 9, 2016 Contractor: Rob HohlClient: Gnarei 1 Farragut Llc | Permit status: Permit issued | Permit id: P1609313 | |||||
SCORE 93 Interior renovation to extend condenser water system in base building. Mep and structural reinforcement. Piping on roof. Date: July 14, 2014 Contractor: Sam Hollen Ramco Of Dc IncClient: Washingon Square Limiited Partnership | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1406769 | |||||
SCORE 93 Interior renovation to 11th floor office space. Partitions, furniture, mep and life safety. American association of exporters and importers Date: August 21, 2014 Contractor: Sam Hollen Ramco Of Dc IncClient: Connecticut And K Associates, Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1409471 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcf1tzgnuvzcddcsbfxgsir Date: August 22, 2015Client: Washington Square Association | Permit type: Electrical | Permit status: Permit issued | Permit id: E50933339 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilf7e%2fegyy6mpekhdnykmmfl Date: October 31, 2015 Contractor: Michael Heisey Sam Hollen Robert WattsClient: Sam Hollen | Permit type: Electrical | Permit status: Permit issued | Permit id: E76976923 | |||||
SCORE 93 Interior renovation to 10th floor office space. Partitions, finishes, mechanical, electrical and life safety. Suite 1090 Date: November 21, 2014 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1501019 | |||||
SCORE 93 Interior renovation to concourse level service corridor and restrooms. New finishes, fixtures, mep and life safety. Date: September 17, 2014 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1412039 | |||||
SCORE 93 Interior renovation to 6th floor office space. Partitions, furniture, mep, life safety and structural. Manatt Date: October 14, 2014 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Limited Partnership | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1411205 | |||||
SCORE 93 Interior renovation to 8th floor office space. Partitions, furniture, mechanical, electrical and life safety. Gibson, dunn and crutcher, llp Date: August 7, 2014 Contractor: Sam Hollen Ramco Of Dc IncClient: Lerner Corporation | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1410632 | |||||
SCORE 93 Renovation to existing mens hair salon on the lower level of washington square. New storefront, flooring and paint. Replace existing light fixtures including emergency. Adding two track lights (new). No mechanical and no life safety changes. Washington square mens salon, inc. Date: January 27, 2014 Contractor: Sam Hollen Ramco Of Dc IncClient: Maria C Tripoli | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1402804 | |||||
SCORE 93 Interior renovations on 6th and 7th floors hvac system upgrade to include new vavs, new ductwork and elimination of perimeter heat pumps. Electrical and life safety. Aba landlord work. Date: April 1, 2014 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Limited Partnership, Lp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1403968 | |||||
SCORE 93 Interior renovation to 6th floor elevator lobby and corridor. New finishes, mechanical, electrical and life safety. Date: December 17, 2014 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1502038 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilevsbxwapda0b%2fxfo0xwsjn Date: January 15, 2015Client: Washington Square Limited Partners | Permit type: Electrical | Permit status: Permit issued | Permit id: E62164618 | |||||
SCORE 93 After hours work permit in conjunction with b1410632 interior 8th floor office permit. 7pm to 4am monday through friday. Date: September 10, 2014 Contractor: Sam Hollen Ramco Of Dc IncClient: Lerner Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400683 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeileni2e9cumuuukdmwk4gr5t Date: October 8, 2015Client: Lawrence Waterman Unispace | Permit type: Electrical | Permit status: Permit issued | Permit id: E73898371 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcbmoxvhecilikeytqevzld Date: August 23, 2013Client: Washington Squre Lerner Corp | Permit type: Electrical | Permit status: Completed | Permit id: E71187667 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilemm8dzco2u%2ffxiaq41nc%2fs Date: November 5, 2014Client: Lerner Corporation | Permit type: Electrical | Permit status: Completed | Permit id: E17021746 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild73ov0wej6oiamcy%2fxy3va Date: November 20, 2014 Contractor: Jeff Wetzel Leaner Corporation Wayne ReepClient: Leaner Corporation | Permit type: Electrical | Permit status: Completed | Permit id: E28463453 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildy6xvsc7y1h32sdjkewidv Date: May 22, 2013 Contractor: Bernard Kalb Lerner Corporation Bernard KalbClient: Lerner Corporation | Permit type: Electrical | Permit status: Completed | Permit id: E88613387 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilemlvij383v57ru5trv5lok Date: July 12, 2013Client: Washington Square Llp- Lerner Corp | Permit type: Electrical | Permit status: Completed | Permit id: E95178143 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfmd%2fqecn3t8wyfchryo00e Date: December 11, 2014Client: Washington Square Limited Partnership | Permit type: Electrical | Permit status: Permit issued | Permit id: E13174710 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcprotncshjjuoni6i%2bdsr%2f Date: May 15, 2013Client: Washington Square Llp Lerner Corp | Permit type: Mechanical | Permit status: Completed | Permit id: Ar98982470 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfyd1ixlbiz08e6q6xpzffg Date: November 14, 2014Client: Leaner Corporation | Permit type: Electrical | Permit status: Completed | Permit id: E44280908 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilc8zxh6hjn%2bobg6ubdt1phm Date: May 15, 2013 Contractor: Andrew Arntson Washington Sq Llp Andrew ArntsonClient: Washington Sq Llp | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P94828391 | |||||
SCORE 86 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilee9njywu50yev9r7jrus8e Date: September 13, 2014 Contractor: Patrick Barron Unknown Unknown Robin MalleyClient: Unknown Unknown | Permit type: Electrical | Permit status: Permit issued | Permit id: E84952919 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfwcosbujftjgy8znlknp%2fm Date: October 30, 2014 Contractor: Gary Mcvey William Breedlove Gary McveyClient: William Breedlove | Permit type: Electrical | Permit status: Permit issued | Permit id: E65127683 | |||||
SCORE 93 Interior renovation to 1st floor tenant space to create two tenants. New demising partition, mep and life safety work. Landlord upgrades. Tenant work under separate permit. Suites 1. 20/1. 21/1. 23 Date: February 4, 2013 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square, Llp Lerner Corp. | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1303297 | |||||
SCORE 93 Interior renovation to 3rd floor office space. Partitions, mechanical, electrical and life safety. Gibson, dunn and crutcher, llp Date: January 22, 2013 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square, Llp Lerner Corp. | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1303299 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildby1xcmnz2ddb0rockw43k Date: April 12, 2012Client: Lerner Enterprise | Permit type: Mechanical | Permit status: Completed | Permit id: Ar71263978 | |||||
SCORE 93 Interior renovation to concourse level elevator lobby. Partitions, finishes, mechanical, electrical and life safety. Date: September 18, 2013 Contractor: Sam Hollen Ramco Of Dc IncClient: Lerner Corp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1310912 | |||||
SCORE 56 Meter valve replacement in pit under sidewalk Date: July 3, 2012 Contractor: Washington Sq L P Partnership Mike GurwitzClient: Washington Sq Limited P Partnership | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200627 | |||||
SCORE 93 Interior renovation to 8th floor office space. Partitions, mep and life safety. New structural convenience stair up to 9th floor. Gibson, dunn ? Crutcher, llp Date: February 8, 2013 Contractor: Sam Hollen Ramco Of Dc IncClient: Lerner Corporation | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1302256 | |||||
SCORE 93 Interior renovation to 10th floor office space. Partitions, mep and life safety. Spec suites 1080/1090 Date: April 3, 2013 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square, Llp Lerner Corporation | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1302979 | |||||
SCORE 93 Interior renovation to 10th floor office space. Partitions, mep and life safety. Spec suites 1060/1070 Date: April 3, 2013 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square, Llp Lerner Corporation | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1302980 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilderlm6rdqtxu2v12rlb22z Date: July 13, 2013Client: Maria C Tripoli Leaner Corp | Permit type: Electrical | Permit status: Permit issued | Permit id: E55861939 | |||||
SCORE 96 Electrical Date: January 28, 2013 Contractor: David C. WilliamsClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1302634 | |||||
SCORE 96 Electrical Date: February 28, 2013 Contractor: Michael F. DuganClient: Maria C Tripoli | Permit status: Completed | Permit id: E1303435 | |||||
SCORE 96 Electrical Date: April 22, 2013 Contractor: Jin Joon HuhClient: Maria C Tripoli | Permit status: Completed | Permit id: E1304698 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilc5szjogaxc13xoym12gdy5 Date: June 28, 2013Client: Washington Square Lerner Group | Permit type: Electrical | Permit status: Permit issued | Permit id: E41031833 | |||||
SCORE 86 Mechanical Date: June 17, 2013 Contractor: James F BrownClient: Maria C Tripoli | Permit status: Completed | Permit id: M1302016 | |||||
Plumbing and gas Date: May 16, 2013Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1304927 | |||||
SCORE 96 Plumbing and gas Date: February 19, 2013 Contractor: Thomas A KelleherClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1302952 | |||||
SCORE 93 Plumbing and gas Date: April 23, 2013 Contractor: Kenneth C. HarrisClient: Maria C Tripoli | Permit status: Completed | Permit id: P1304456 | |||||
SCORE 89 Plumbing and gas Date: February 14, 2013 Contractor: Shaw HergenratherClient: Maria C Tripoli | Permit status: Completed | Permit id: P1302902 | |||||
SCORE 59 Install new stainless steel cladding over existing metal cladding at metro security gate enclosure on basement. Change finish from bronze to stainless stain. Replace 2 existing signs which each is less than 25 square foot in size. Wmata has reviewed and approved the alteration. Letter approval is attached. Date: May 7, 2012 Contractor: Lerner CorpClient: Washington Square Limited Partnership | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1208408 | |||||
SCORE 56 Interior renovation of the existing entrance and lobby area of an existing restaurant including replacement of existing lighting fixtures, carpeting, upholstery, ceilings and walls. No plumbing, no hvac. No change of use. No change to current occupancy of 303 seats 396 max occupancy. Date: August 16, 2012Client: Mortons Steakhouse | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1212698 | |||||
SCORE 56 Renovations to existing office space on the 4th and 5th floors, american bar association as shown on the attached mep, fire protection and architectural dwgs. Interior work only. Date: October 31, 2012 Contractor: American Bar Association John GiusepperamcoClient: American Bar Association | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1214485 | |||||
SCORE 56 Installation of the following wall mounted signs sign a front elevation internally illuminated aluminun face wall cabinet 9ft. X2ft. Total of 18 sq. Ft. Sign b front elevation non illuminated pan channel letters 5ft. 7 3/4 in. X 1ft. 13/4in. Total of 6. 47sq. Ft. Sign c1 and c2 vinyl layout on existing balconies glass. 4ft. 11 1/4in x 1ft. Total of 4. 94 ea. Sq ft. Total sq. Ft. Of all signage is 34. 35 sq. Ft. Signage is replacement of existing signage for mortons the steakhouse Date: September 11, 2012Client: Anna Diperna Trustee | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1200495 | |||||
SCORE 93 Interior renovation to 2nd and 3rd floor office space. Partitions, mechanical, electrical and life safety. Gibson, dunn and crutcher, llp Date: March 20, 2013 Contractor: Sam Hollen Ramco Of Dc IncClient: Wahington Square, Llp Lerner Corp. | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1304433 | |||||
SCORE 93 Interior renovations to restrooms and corridors on floors 4, 5, 6, 7 and 10. New finishes, fixtures, mep and life safety. Date: March 26, 2013 Contractor: Sam Hollen Ramco Of Dc IncClient: Washington Square Limited Partnership, Llplerner | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1303810 | |||||
SCORE 96 Electrical Date: September 9, 2014 Contractor: John H ThomsonPermit status: Permit issued | Permit id: E1408848 | |||||
SCORE 96 Electrical Date: October 9, 2014 Contractor: Gregory E LigonPermit status: Permit issued | Permit id: E1500256 | |||||
SCORE 96 Electrical Date: October 9, 2014 Contractor: Philip G DonnellyClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1500247 | |||||
SCORE 96 Electrical Date: October 16, 2014 Contractor: Dennis R. WoodeClient: Maria C Tripoli | Permit status: Completed | Permit id: E1500407 | |||||
SCORE 93 Electrical Date: February 19, 2014 Contractor: Frank V CantwellClient: Maria C Tripoli | Permit status: Completed | Permit id: E1403380 | |||||
SCORE 96 Electrical Date: May 8, 2014 Contractor: Herbert D LautClient: Maria C Tripoli | Permit status: Completed | Permit id: E1405476 | |||||
SCORE 93 Electrical Date: July 22, 2014 Contractor: Floyd D ConnellyClient: Maria C Tripoli | Permit status: Completed | Permit id: E1407421 | |||||
SCORE 96 Mechanical Date: May 30, 2014 Contractor: Wayne E. BowersClient: Maria C Tripoli | Permit status: Permit issued | Permit id: M1401985 | |||||
SCORE 96 Mechanical Date: July 25, 2014 Contractor: Wayne E. BowersClient: Mario Tripoli | Permit status: Permit issued | Permit id: M1402703 | |||||
SCORE 96 Mechanical Date: July 17, 2014 Contractor: Christos T SakkosClient: Maria C Tripoli | Permit status: Completed | Permit id: M1402604 | |||||
Plumbing and gas Date: September 17, 2014Permit status: Permit issued | Permit id: P1408657 | |||||
SCORE 98 Plumbing and gas Date: October 6, 2014 Contractor: David FlemingPermit status: Permit issued | Permit id: P1500150 | |||||
Plumbing and gas Date: February 19, 2014Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1403358 | |||||
Interior renovation my eye dr. Date: February 7, 2012Client: Washington Square Limited Partnership | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1204696 | |||||
SCORE 56 Renovations to existing 11th and 12th floor office space for baker hostetler, scope of work on 11th floor is new unisex restroom,approx. 3 sq. Ft, and renovations to offices on the 12th floor, approx 20,158 sq. Ft. All as shown on the attached building plans. Interior work only. Date: October 3, 2012 Contractor: Lerner John GiusepperamcoClient: Lerner | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1211818 | |||||
Plumbing and gas Date: September 19, 2014Client: Maria C Tripoli | Permit status: Completed | Permit id: P1408700 | |||||
SCORE 96 Plumbing and gas Date: July 17, 2014 Contractor: Christos T. SakkosClient: Maria C Tripoli | Permit status: Completed | Permit id: P1407062 | |||||
SCORE 98 Plumbing and gas Date: November 7, 2014 Contractor: David FlemingPermit status: Completed | Permit id: P1501056 | |||||
Plumbing and gas Date: June 15, 2012Client: Washington Square Limited Partnership | Permit status: Permit issued | Permit id: P1205897 | |||||
Plumbing and gas Date: October 19, 2012Client: Anna Diperna Trustee | Permit status: Permit issued | Permit id: P1300463 | |||||
Plumbing and gas Date: May 4, 2012Client: Lerner Enterprise | Permit status: Permit issued | Permit id: P1204955 | |||||
SCORE 96 Plumbing and gas Date: May 4, 2012 Contractor: Robert W. ParsonsClient: Washington Square Limited Partnership | Permit status: Permit issued | Permit id: P1204969 | |||||
SCORE 61 Plumbing and gas Date: October 5, 2012 Contractor: Bill SaunderClient: Anna Diperna Trustee | Permit status: Permit issued | Permit id: P1300129 | |||||
SCORE 56 Replace existing fire pump, jockey pump,fire pump controller and jockey pump controller. Date: October 5, 2012 Contractor: Lerner Corp David HowellClient: Lerner Corp | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1213474 | |||||
SCORE 89 Electrical Date: July 12, 2012 Contractor: Craig A. LlewellynClient: Washington Square Limited Partnership | Permit status: Completed | Permit id: E1207611 | |||||
SCORE 93 Electrical Date: November 6, 2012 Contractor: Marion C DeanClient: Anna Diperna Trustee | Permit status: Completed | Permit id: E1300889 | |||||
SCORE 96 Electrical Date: October 5, 2012 Contractor: Bernard G KalbClient: Anna Diperna Trustee | Permit status: Completed | Permit id: E1300194 | |||||
SCORE 96 Electrical Date: October 10, 2012 Contractor: Philip G DonnellyClient: Anna Diperna Trustee | Permit status: Completed | Permit id: E1300280 | |||||
SCORE 96 Plumbing and gas Date: October 18, 2012 Contractor: Richard V CareyClient: Anna Diperna Trustee | Permit status: Completed | Permit id: P1300422 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildorznafkpquuiyzexwugjd Date: July 30, 2012Permit type: Plumbing and gas | Permit status: Completed | Permit id: P13052846 | |||||
SCORE 100 Plumbing and gas Date: October 31, 2012 Contractor: John McdonaldClient: Anna Diperna Trustee | Permit status: Permit issued | Permit id: P1300670 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeiledqi21ibegscck%2bvl%2bffbk Date: December 12, 2012Client: Washington Square Limited | Permit type: Electrical | Permit status: Permit issued | Permit id: E72156507 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcqg1tz5p%2b1pcda78nmyza1 Date: October 17, 2012 Contractor: Cliff Collins Lerner Corp Trust Robert DikeClient: Lerner Corp Trust | Permit type: Electrical | Permit status: Permit issued | Permit id: E37657665 | |||||
SCORE 89 Electrical Date: January 7, 2016 Contractor: Orlando M CatanaClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1602634 | |||||
SCORE 79 Electrical Date: June 1, 2016 Contractor: Jeffrey M. YinglingClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1606846 | |||||
SCORE 96 Electrical Date: December 11, 2012 Contractor: Michael F. DuganClient: Anna Diperna Trustee | Permit status: Permit issued | Permit id: E1301658 | |||||
SCORE 96 Electrical Date: December 11, 2012 Contractor: Michael F. DuganClient: Anna Diperna Trustee | Permit status: Permit issued | Permit id: E1301657 | |||||
Electrical Date: January 31, 2012Client: Washington Square Limited Partnership | Permit status: Permit issued | Permit id: E1203079 | |||||
SCORE 86 Mechanical Date: March 17, 2016 Contractor: Brandon K ViernesClient: Maria C Tripoli | Permit status: Permit issued | Permit id: M1601451 | |||||
SCORE 96 Mechanical Date: October 20, 2016 Contractor: Robert L HunterClient: Maria C Tripoli | Permit status: Permit issued | Permit id: M1700181 | |||||
Plumbing and gas Date: January 18, 2012Client: Washington Square Limited Partnership | Permit status: Completed | Permit id: P1202475 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildjkm1me%2foukz3po9twain4 Date: July 25, 2012 Contractor: David Raine Lerner Enterprises David RaineClient: Lerner Enterprises | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P27303126 | |||||
Plumbing and gas Date: January 19, 2016Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1602976 | |||||
Plumbing and gas Date: January 5, 2016Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1602626 | |||||
Plumbing and gas Date: April 8, 2016Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1605257 | |||||
SCORE 93 Plumbing and gas Date: September 9, 2016 Contractor: Rob HohlClient: Gnarei 1 Farragut Llc | Permit status: Permit issued | Permit id: P1609313 | |||||
Plumbing and gas Date: October 18, 2016Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1700395 | |||||
SCORE 59 Interior demolition to 10th floor office space. No structural. 24,0 square feet. Date: March 28, 2016Client: Maria C Tripoli | Permit type: Demolition | Permit status: Permit issued | Permit id: D1600471 | |||||
SCORE 56 1 new equipment rack inside existing equipment room 3 new omni antennas on existing self support tower on rooftop 3 new 1-5/8 inch coax cables Date: February 11, 2016 Contractor: Daniel Goodrich C O Md7Client: Maria C Tripoli Co Leaner Corp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: An1600038 | |||||
SCORE 56 After hours work permit in conjunction with d1600471, interior demo 10th floor office space. 7pm to 7am monday through friday. Date: May 9, 2016Client: Maria C Tripoli | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600685 | |||||
SCORE 59 After hours work permit in conjunction with b1510861, 10th floor interior office renovation. 7pm to 7am monday through saturday. Date: August 24, 2016Client: Washington Square Limited Partnership, Llp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1601001 | |||||
SCORE 96 Mechanical Date: October 20, 2016 Contractor: Robert L HunterClient: Maria C Tripoli | Permit status: Permit issued | Permit id: M1700181 | |||||
SCORE 56 Interior renovation to 10th floor office space. Partitions, furniture, mechanical, electrical and life safety. 4608 square feet. Mmc oliver wyman Date: October 17, 2016Client: Washington Square Associates Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1612488 | |||||
Plumbing and gas Date: September 17, 2014Client: Connecticut & K Associates Llc | Permit status: Permit issued | Permit id: P1408657 | |||||
SCORE 98 Plumbing and gas Date: October 6, 2014 Contractor: David FlemingClient: Connecticut & K Associates Llc | Permit status: Permit issued | Permit id: P1500150 | |||||
SCORE 96 Mechanical Date: July 17, 2014 Contractor: Christos T SakkosClient: Maria C Tripoli | Permit status: Completed | Permit id: M1402604 | |||||
SCORE 96 Mechanical Date: May 30, 2014 Contractor: Wayne E. BowersClient: Maria C Tripoli | Permit status: Permit issued | Permit id: M1401985 | |||||
SCORE 96 Plumbing and gas Date: July 17, 2014 Contractor: Christos T. SakkosClient: Maria C Tripoli | Permit status: Completed | Permit id: P1407062 | |||||
SCORE 100 Plumbing and gas Date: March 9, 2016 Contractor: Jerone ScottClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1604350 | |||||
Electrical Date: January 5, 2017Client: Learner Corp | Permit status: Permit issued | Permit id: E1702616 | |||||
SCORE 80 Non structural partition wall demolition to the 6th floor. Date: June 3, 2013 Contractor: Fvi 20 20Client: Maria C Tripoli | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300561 | |||||
SCORE 89 Placing inner duct between existing verizon manholes. July 11, 2014 august 11, 2014, 7pm 2am. And saturday only. Date: July 14, 2014 Contractor: Michael SonesenClient: Comcast Cable | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400574 | |||||
SCORE 99 An after hours permit is respectfully requested from 4am saturday thru 9pm sunday Date: June 6, 2014 Contractor: Christine LongClient: Crane Service Co | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400499 | |||||
SCORE 91 Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: July 14, 2014 Contractor: William HartPermit type: Building | Permit status: Permit issued | Permit id: Pc42945760 | |||||
SCORE 93 Install one foot flagpole, building column mounted at a 45 degree angle. Date: June 26, 2014 Contractor: Jopatric Love AmericodeClient: Maria C Tripoli | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1408858 | |||||
SCORE 56 Installation of the following wall mounted signs sign a front elevation internally illuminated aluminun face wall cabinet 9ft. X2ft. Total of 18 sq. Ft. Sign b front elevation non illuminated pan channel letters 5ft. 7 3 4 in. X 1ft. 13 4in. Total of 6. 47sq. Ft. Sign c1 and c2 vinyl layout on existing balconies glass. 4ft. 11 1 4in x 1ft. Total of 4. 94 ea. Sq ft. Total sq. Ft. Of all signage is 34. 35 sq. Ft. Signage is replacement of existing signage for mortons the steakhouse Date: September 11, 2012Client: Anna Diperna Trustee | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1200495 | |||||
SCORE 88 Interior demolition of 10th floor office space. Not structural Date: August 13, 2012 Contractor: Sam HollenClient: Washington Square Limited Partnership | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200959 | |||||
SCORE 56 Renovations to existing office space on the 4th and 5th floors, american bar association as shown on the attached mep, fire protection and architectural dwgs. Interior work only. Date: October 31, 2012 Contractor: American Bar Association; John GiusepperamcoClient: American Bar Association | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1214485 | |||||
SCORE 56 Interior renovation of the existing entrance and lobby area of an existing restaurant including replacement of existing lighting fixtures, carpeting, upholstery, ceilings and walls. No plumbing, no hvac. No change of use. No change to current occupancy of 303 seats 396 max occupancy. Date: August 16, 2012Client: Mortons Steakhouse | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1212698 | |||||
SCORE 56 Install new stainless steel cladding over existing metal cladding at metro security gate enclosure on basement. Change finish from bronze to stainless stain. Replace 2 existing signs which each is less than 25 square foot in size. Wmata has reviewed and approved the alteration. Letter approval is attached. Date: May 7, 2012 Contractor: Lerner Corp,Client: Washington Square Limited Partnership | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1208408 | |||||
SCORE 56 Renew of permit b1105148 as per existing permit renovation to11th fl east and west restroom,12th fl west restroom and tenant space on both 11th and 12th fl with nee convenices stairs beong constructed. All per attached plans interior work only. Date: June 29, 2012 Contractor: Washington Square Limited PartnershClient: Washington Square Limited Partnership | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1210971 | |||||
SCORE 56 Replace existing fire pump, jockey pump,fire pump controller and jockey pump controller. Date: October 5, 2012 Contractor: Lerner Corp; David HowellClient: Lerner Corp | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1213474 | |||||
Interior renovation my eye dr. Date: February 7, 2012Client: Washington Square Limited Partnership | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1204696 | |||||
SCORE 56 Renovations to existing 11th and 12th floor office space for baker hostetler, scope of work on 11th floor is new unisex restroom,approx. 3 sq. Ft, and renovations to offices on the 12th floor, approx 20,158 sq. Ft. All as shown on the attached building plans. Interior work only. Date: October 3, 2012 Contractor: Lerner; John GiusepperamcoClient: Lerner | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1211818 | |||||
SCORE 56 Replacement of ahus on the 5th floor, installation of new mechanical systems, demolition of interconnecting stairs and slab infill 5th, 6th and 7th floors. Date: December 20, 2012 Contractor: Lerner CorporationClient: Anna Diperna Trustee | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1300638 | |||||
SCORE 86 Revision to bldg. Permit b1214485 to show changes to mechanical plans and to electrical plan as per the attached revised m. 01, m. 02 and e4. 02 dwgs. And written description of changes. Interior work only for aba. No architectural, plumbing, or fire protection changes. Date: November 1, 2012 Contractor: GiusepperamcoClient: American Bar Association | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1301024 | |||||
SCORE 56 Meter valve replacement in pit under sidewalk Date: July 3, 2012 Contractor: Washington Sq L P Partnership; Mike GurwitzClient: Washington Sq Limited P Partnership | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200627 | |||||
SCORE 96 Electrical Date: December 11, 2012 Contractor: Michael F. DuganClient: Anna Diperna Trustee | Permit status: Permit issued | Permit id: E1301658 | |||||
SCORE 96 Electrical Date: December 11, 2012 Contractor: Michael F. DuganClient: Anna Diperna Trustee | Permit status: Permit issued | Permit id: E1301657 | |||||
Electrical Date: January 31, 2012Client: Washington Square Limited Partnership | Permit status: Permit issued | Permit id: E1203079 | |||||
SCORE 61 Plumbing and gas Date: October 5, 2012 Contractor: Bill SaunderClient: Anna Diperna Trustee | Permit status: Permit issued | Permit id: P1300129 | |||||
SCORE 96 Plumbing and gas Date: May 4, 2012 Contractor: Robert W. ParsonsClient: Washington Square Limited Partnership | Permit status: Permit issued | Permit id: P1204969 | |||||
Plumbing and gas Date: May 4, 2012Client: Lerner Enterprise | Permit status: Permit issued | Permit id: P1204955 | |||||
Plumbing and gas Date: October 19, 2012Client: Anna Diperna Trustee | Permit status: Permit issued | Permit id: P1300463 | |||||
Plumbing and gas Date: June 15, 2012Client: Washington Square Limited Partnership | Permit status: Permit issued | Permit id: P1205897 | |||||
SCORE 100 Plumbing and gas Date: October 31, 2012 Contractor: John McdonaldClient: Anna Diperna Trustee | Permit status: Permit issued | Permit id: P1300670 | |||||
SCORE 89 Electrical Date: July 12, 2012 Contractor: Craig A. LlewellynClient: Washington Square Limited Partnership | Permit status: Completed | Permit id: E1207611 | |||||
SCORE 93 Electrical Date: November 6, 2012 Contractor: Marion C DeanClient: Anna Diperna Trustee | Permit status: Completed | Permit id: E1300889 | |||||
SCORE 96 Electrical Date: October 5, 2012 Contractor: Bernard G KalbClient: Anna Diperna Trustee | Permit status: Completed | Permit id: E1300194 | |||||
SCORE 96 Electrical Date: October 10, 2012 Contractor: Philip G DonnellyClient: Anna Diperna Trustee | Permit status: Completed | Permit id: E1300280 | |||||
Plumbing and gas Date: January 18, 2012Client: Washington Square Limited Partnership | Permit status: Completed | Permit id: P1202475 | |||||
SCORE 96 Plumbing and gas Date: October 18, 2012 Contractor: Richard V CareyClient: Anna Diperna Trustee | Permit status: Completed | Permit id: P1300422 | |||||
SCORE 93 Interior renovation to 1st floor tenant space to create two tenants. New demising partition, mep and life safety work. Landlord upgrades. Tenant work under separate permit. Suites 1. 20 1. 21 1. 23 Date: February 4, 2013 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square, Llp Lerner Corp. | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1303297 | |||||
SCORE 93 Interior renovation to 3rd floor office space. Partitions, mechanical, electrical and life safety. Gibson, dunn and crutcher, llp Date: January 22, 2013 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square, Llp Lerner Corp. | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1303299 | |||||
SCORE 93 Interior renovation to 8th floor office space. Partitions, mep and life safety. New structural convenience stair up to 9th floor. Gibson, dunn ? Crutcher, llp Date: February 8, 2013 Contractor: Sam Hollen Ramco Of Dc, IncClient: Lerner Corporation | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1302256 | |||||
SCORE 93 Interior renovation to 10th floor office space. Partitions, mep and life safety. Spec suites 1080 1090 Date: April 3, 2013 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square, Llp Lerner Corporation | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1302979 | |||||
SCORE 93 Interior renovation to 10th floor office space. Partitions, mep and life safety. Spec suites 1060 1070 Date: April 3, 2013 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square, Llp Lerner Corporation | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1302980 | |||||
SCORE 93 Interior renovation to 2nd and 3rd floor office space. Partitions, mechanical, electrical and life safety. Gibson, dunn and crutcher, llp Date: March 20, 2013 Contractor: Sam Hollen Ramco Of Dc, IncClient: Wahington Square, Llp Lerner Corp. | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1304433 | |||||
SCORE 93 Interior renovations to restrooms and corridors on floors 4, 5, 6, 7 and 10. New finishes, fixtures, mep and life safety. Date: March 26, 2013 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square Limited Partnership, Llp Lerner | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1303810 | |||||
SCORE 93 Interior renovation to concourse level elevator lobby. Partitions, finishes, mechanical, electrical and life safety. Date: September 18, 2013 Contractor: Sam Hollen Ramco Of Dc, IncClient: Lerner Corp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1310912 | |||||
SCORE 96 Electrical Date: January 28, 2013 Contractor: David C. WilliamsClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1302634 | |||||
SCORE 96 Electrical Date: February 5, 2013 Contractor: Michael F. DuganClient: Maria C Tripoli | Permit status: Completed | Permit id: E1302822 | |||||
SCORE 96 Electrical Date: February 28, 2013 Contractor: Michael F. DuganClient: Maria C Tripoli | Permit status: Completed | Permit id: E1303435 | |||||
SCORE 96 Electrical Date: April 22, 2013 Contractor: Jin Joon HuhClient: Maria C Tripoli | Permit status: Completed | Permit id: E1304698 | |||||
SCORE 96 Plumbing and gas Date: February 19, 2013 Contractor: Thomas A KelleherClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1302952 | |||||
Plumbing and gas Date: February 8, 2013Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1302757 | |||||
Plumbing and gas Date: May 16, 2013Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1304927 | |||||
SCORE 86 Mechanical Date: June 17, 2013 Contractor: James F BrownClient: Maria C Tripoli | Permit status: Completed | Permit id: M1302016 | |||||
SCORE 93 Plumbing and gas Date: April 23, 2013 Contractor: Kenneth C. HarrisClient: Maria C Tripoli | Permit status: Completed | Permit id: P1304456 | |||||
SCORE 89 Plumbing and gas Date: February 14, 2013 Contractor: Shaw HergenratherClient: Maria C Tripoli | Permit status: Completed | Permit id: P1302902 | |||||
SCORE 89 Plumbing and gas Date: February 26, 2013 Contractor: Shaw HergenratherClient: Mario Tripoli | Permit status: Completed | Permit id: P1303125 | |||||
Plumbing and gas Date: April 15, 2013Client: Maria C Tripoli | Permit status: Completed | Permit id: P1304267 | |||||
SCORE 93 Interior renovation to 11th floor office space. Partitions, furniture, mep and life safety. American association of exporters and importers Date: August 21, 2014 Contractor: Sam Hollen Ramco Of Dc, IncClient: Connecticut And K Associates, Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1409471 | |||||
SCORE 93 Renovation to existing mens hair salon on the lower level of washington square. New storefront, flooring and paint. Replace existing light fixtures including emergency. Adding two track lights (new). No mechanical and no life safety changes. Washington square mens salon, inc. Date: January 27, 2014 Contractor: Sam Hollen Ramco Of Dc, IncClient: Maria C Tripoli | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1402804 | |||||
SCORE 93 Interior renovations on 6th and 7th floors hvac system upgrade to include new vavs, new ductwork and elimination of perimeter heat pumps. Electrical and life safety. Aba landlord work. Date: April 1, 2014 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square Limited Partnership, Lp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1403968 | |||||
SCORE 93 Interior renovation to extend condenser water system in base building. Mep and structural reinforcement. Piping on roof. Date: July 14, 2014 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washingon Square Limiited Partnership | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1406769 | |||||
SCORE 93 Interior renovation to 8th floor office space. Partitions, furniture, mechanical, electrical and life safety. Gibson, dunn and crutcher, llp Date: August 7, 2014 Contractor: Sam Hollen Ramco Of Dc, IncClient: Lerner Corporation | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1410632 | |||||
SCORE 93 Interior renovation to 6th floor office space. Partitions, furniture, mep, life safety and structural. Manatt Date: October 14, 2014 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square Limited Partnership | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1411205 | |||||
SCORE 93 Interior renovation to concourse level service corridor and restrooms. New finishes, fixtures, mep and life safety. Date: September 17, 2014 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1412039 | |||||
SCORE 93 Interior renovation to 10th floor office space. Partitions, finishes, mechanical, electrical and life safety. Suite 1090 Date: November 21, 2014 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1501019 | |||||
SCORE 93 Interior renovation to 6th floor elevator lobby and corridor. New finishes, mechanical, electrical and life safety. Date: December 17, 2014 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1502038 | |||||
SCORE 93 After hours work permit in conjunction with b1410632 interior 8th floor office permit. 7pm to 4am monday through friday. Date: September 10, 2014 Contractor: Sam Hollen Ramco Of Dc, IncClient: Lerner Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400683 | |||||
SCORE 96 Electrical Date: October 9, 2014 Contractor: Philip G DonnellyClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1500247 | |||||
SCORE 96 Electrical Date: October 9, 2014 Contractor: Gregory E LigonClient: Connecticut & K Associates Llc | Permit status: Permit issued | Permit id: E1500256 | |||||
SCORE 96 Electrical Date: September 9, 2014 Contractor: John H ThomsonClient: Connecticut & K Associates Llc | Permit status: Permit issued | Permit id: E1408848 | |||||
SCORE 96 Electrical Date: November 12, 2014 Contractor: John H ThomsonClient: Connecticut & K Associates Llc | Permit status: Completed | Permit id: E1501008 | |||||
SCORE 96 Electrical Date: October 16, 2014 Contractor: Dennis R. WoodeClient: Maria C Tripoli | Permit status: Completed | Permit id: E1500407 | |||||
SCORE 93 Electrical Date: February 19, 2014 Contractor: Frank V CantwellClient: Maria C Tripoli | Permit status: Completed | Permit id: E1403380 | |||||
SCORE 96 Electrical Date: May 8, 2014 Contractor: Herbert D LautClient: Maria C Tripoli | Permit status: Completed | Permit id: E1405476 | |||||
SCORE 93 Electrical Date: July 22, 2014 Contractor: Floyd D ConnellyClient: Maria C Tripoli | Permit status: Completed | Permit id: E1407421 | |||||
Plumbing and gas Date: February 19, 2014Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1403358 | |||||
SCORE 98 Plumbing and gas Date: October 6, 2014 Contractor: David FlemingClient: Connecticut & K Associates Llc | Permit status: Permit issued | Permit id: P1500150 | |||||
Plumbing and gas Date: September 17, 2014Client: Connecticut & K Associates Llc | Permit status: Permit issued | Permit id: P1408657 | |||||
SCORE 98 Plumbing and gas Date: November 7, 2014 Contractor: David FlemingClient: Connecticut & K Associates Llc | Permit status: Completed | Permit id: P1501056 | |||||
SCORE 96 Mechanical Date: July 17, 2014 Contractor: Christos T SakkosClient: Maria C Tripoli | Permit status: Completed | Permit id: M1402604 | |||||
Plumbing and gas Date: September 19, 2014Client: Maria C Tripoli | Permit status: Completed | Permit id: P1408700 | |||||
SCORE 96 Plumbing and gas Date: July 17, 2014 Contractor: Christos T. SakkosClient: Maria C Tripoli | Permit status: Completed | Permit id: P1407062 | |||||
SCORE 96 Mechanical Date: May 30, 2014 Contractor: Wayne E. BowersClient: Maria C Tripoli | Permit status: Permit issued | Permit id: M1401985 | |||||
SCORE 96 Mechanical Date: July 25, 2014 Contractor: Wayne E. BowersClient: Mario Tripoli | Permit status: Permit issued | Permit id: M1402703 | |||||
SCORE 98 Interior demolition as per plans. Date: June 16, 2015 Contractor: Jason BentleyClient: Washington Square | Permit type: Demolition | Permit status: Permit issued | Permit id: D1500617 | |||||
SCORE 98 Install 2-flat metal panels - routed out letters w plastic cutouts. Date: April 6, 2015 Contractor: NoneClient: Connecticut & K Associates Llc | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1500210 | |||||
SCORE 100 Interior alteration to beauty salon Date: December 15, 2015 Contractor: George DelgadoClient: Maria C Tripoli | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1602147 | |||||
SCORE 93 Interior renovation to 10th floor office space. Partitions, furniture, mep and life safety. 4788 square feet. Spec suite Date: September 15, 2015 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1510861 | |||||
SCORE 56 Interior alteration to existing space for cobblers bench tenant Date: November 18, 2015 Contractor: Maria C Tripoli Maria C TripoliClient: Maria C Tripoli Maria C Tripoli | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1511363 | |||||
SCORE 93 Interior renovation to 11th floor lunch room. New millwork, finishes, electrical and life safety. No mechanical. Replacement in kind of plumbing fixture. Baker and hostetler Date: June 29, 2015 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square Assoc Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1509362 | |||||
SCORE 93 Interior renovations to concourse, 5th and 10th floor elevator lobbies. New finishes, mechanical, electrical and life safety. Date: April 9, 2015 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1503805 | |||||
SCORE 93 Interior renovation to 5th floor office space. Partitions, furniture, mep and life safety. 29,893 square feet. Regus 0402 Date: August 4, 2015 Contractor: Sam Hollen Ramco Of Dc, IncClient: Maria C Tripoli | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1504936 | |||||
SCORE 93 Interior renovation to 10th floor office space. Partitions, mechanical, electrical and life safety. 15 sq feet. The arab gulf states institute in washington suite 1060 Date: June 11, 2015 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1508654 | |||||
SCORE 93 Interior renovation to 6th floor office space. Partitions, finishes, mechanical, electrical and life safety. 4626 square feet. Manatt Date: September 17, 2015 Contractor: Sam Hollen Ramco Of Dc, IncClient: Maria C Tripoli | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1509898 | |||||
SCORE 56 After hours work for a interior fit out for regus Date: September 30, 2015 Contractor: Cole MartinezClient: Eric Black Lerner Corp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500804 | |||||
SCORE 93 After hours work permit in conjunction with b1509898. Interior 6th floor office renovation. 7pm to 7am monday through saturday. Start 9-18-15 end 10-18-15. Date: September 18, 2015 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square Associates Limited Partnership, Llp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500774 | |||||
SCORE 93 After hours work permit in conjunction with b1503805. 7pm to 7am. Monday through saturday. Start 10-5-15. End 11-5-15 Date: October 5, 2015 Contractor: Sam Hollen Ramco Of Dc, IncClient: Washington Square Limited Partnership, Llp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600008 | |||||
SCORE 56 After hours work permit in conjunction with b1503805. Interior lobby renovations. 7pm to 7am monday through saturday. Start 9-3-15 end 10-3-15. Date: September 3, 2015 Contractor: Sam Hollen Ramco Of Dc,IncClient: Washington Square Limited Partnership,Llp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500727 | |||||
SCORE 96 Electrical Date: August 27, 2015 Contractor: Herbert D LautClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1508812 | |||||
SCORE 96 Electrical Date: January 2, 2015 Contractor: David C. WilliamsClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1502210 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https: ospi. Dcra. Dc. Gov ospi printpermit. Aspx? Param=zi8iggjeildsrti55o62ljh7uulxk6db Date: February 18, 2015Client: Washington Square Limited Partnership, Llp | Permit type: Electrical | Permit status: Completed | Permit id: E68153203 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https: ospi. Dcra. Dc. Gov ospi printpermit. Aspx? Param=zi8iggjeilcf%2fnrjrgp%2b38yjfejn4qgk Date: September 17, 2015Client: Washington Square Limited Partnership, Llp | Permit type: Electrical | Permit status: Completed | Permit id: E60925143 | |||||
SCORE 76 Electrical Date: September 29, 2015 Contractor: Aschalew AsaminewClient: Maria C Tripoli | Permit status: Completed | Permit id: E1509746 | |||||
SCORE 96 Plumbing and gas Date: October 7, 2015 Contractor: Christos T. SakkosClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1600181 | |||||
SCORE 96 Plumbing and gas Date: October 28, 2015 Contractor: Jay W LippClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1600831 | |||||
Plumbing and gas Date: October 28, 2015Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1600828 | |||||
SCORE 93 Plumbing and gas Date: December 23, 2015 Contractor: Matt LosignorClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1602405 | |||||
SCORE 96 Plumbing and gas Date: August 7, 2015 Contractor: Thomas A KelleherClient: Maria C Tripoli | Permit status: Completed | Permit id: P1508080 | |||||
SCORE 89 Plumbing and gas Date: August 12, 2015 Contractor: Shaw HergenratherClient: Maria C Tripoli | Permit status: Completed | Permit id: P1508208 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https: ospi. Dcra. Dc. Gov ospi printpermit. Aspx? Param=zi8iggjeild0mljpr3ekd4pntenjys%2bk Date: March 3, 2015Client: Washington Square Limited Partnership, Llp | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P94457354 | |||||
SCORE 93 Plumbing and gas Date: September 25, 2015 Contractor: Rob HohlClient: Maria C Tripoli | Permit status: Completed | Permit id: P1509367 | |||||
SCORE 86 Mechanical Date: March 17, 2016 Contractor: Brandon K ViernesClient: Maria C Tripoli | Permit status: Permit issued | Permit id: M1601451 | |||||
SCORE 65 Interior demolition to 10th floor office space. No structural. 24,0 square feet. Date: March 28, 2016Client: Maria C Tripoli | Permit type: Demolition | Permit status: Permit issued | Permit id: D1600471 | |||||
SCORE 56 Concrete repairs and floor drain replacement in garage Date: August 15, 2016Client: Maria C Tripoli | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1609914 | |||||
SCORE 56 1 new equipment rack inside existing equipment room 3 new omni antennas on existing self support tower on rooftop 3 new 1-5 8 inch coax cables Date: February 11, 2016 Contractor: Daniel Goodrich, C O Md7Client: Maria C Tripoli C O Leaner Corp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: An1600038 | |||||
SCORE 56 Interior renovation to 10th floor office space. Partitions, furniture, mechanical, electrical and life safety. 4608 square feet. Mmc oliver wyman Date: October 17, 2016Client: Washington Square Associates Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1612488 | |||||
SCORE 56 After hours permit for garage concrete repair work associated with building permit b1609914. No work january 20, 2017 - inauguration day please note additional restrictions on work may apply 1 18 2017 - 1 21 2017 due to inauguration activities Date: December 28, 2016 Contractor: Leaner Corporation; Elizabeth HerrityClient: Leaner Corporation | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700309 | |||||
SCORE 65 After hours work permit in conjunction with b1510861, 10th floor interior office renovation. 7pm to 7am monday through saturday. Date: August 24, 2016Client: Washington Square Limited Partnership, Llp | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1601001 | |||||
SCORE 56 After hours work permit in conjunction with d1600471, interior demo 10th floor office space. 7pm to 7am monday through friday. Date: May 9, 2016Client: Maria C Tripoli | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600685 | |||||
SCORE 79 Electrical Date: June 1, 2016 Contractor: Jeffrey M. YinglingClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1606846 | |||||
SCORE 89 Electrical Date: January 7, 2016 Contractor: Orlando M CatanaClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1602634 | |||||
SCORE 93 Plumbing and gas Date: September 9, 2016 Contractor: Rob HohlClient: Gnarei 1 Farragut Llc | Permit status: Permit issued | Permit id: P1609314 | |||||
Plumbing and gas Date: April 8, 2016Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1605257 | |||||
Plumbing and gas Date: March 15, 2016Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1604565 | |||||
SCORE 100 Plumbing and gas Date: March 9, 2016 Contractor: Jerone ScottClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1604350 | |||||
Plumbing and gas Date: January 5, 2016Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1602626 | |||||
Plumbing and gas Date: January 19, 2016Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1602976 | |||||
SCORE 96 Mechanical Date: October 20, 2016 Contractor: Robert L HunterClient: Maria C Tripoli | Permit status: Completed | Permit id: M1700181 | |||||
Plumbing and gas Date: October 18, 2016Client: Maria C Tripoli | Permit status: Completed | Permit id: P1700395 | |||||
SCORE 65 Interior renovation to 6th floor office space. Partitions, furniture, mep and life safety. Spec suite 680, 6184 square feet. Spec suite 690, 3487 square feet. 9671 total square feet. Date: May 4, 2017Client: Washington Square Limited Partnership, Llp | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1706737 | |||||
SCORE 69 Interior renovation to 6th floor office space. Partitions, furniture, mep and life safety. Spec suite 680, 6184 square feet. Spec suite 690, 3487 square feet. 9671 total square feet. Date: May 26, 2017 Contractor: Crystal HarringtonClient: Mario Tripoli | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700876 | |||||
Electrical Date: January 5, 2017Client: Learner Corp | Permit status: Permit issued | Permit id: E1702616 | |||||
SCORE 59 Plumbing and gas Date: June 5, 2017 Contractor: William AkersClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1706393 | |||||
Plumbing and gas Date: May 8, 2017Client: Washington Square Limited Partnership Llc | Permit status: Permit issued | Permit id: P1705714 | |||||
SCORE 82 Plumbing and gas Date: January 24, 2017 Contractor: Tim ParhamClient: Maria C Tripoli | Permit status: Permit issued | Permit id: P1703045 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcqg1tz5p%2b1pcda78nmyza1 Date: October 17, 2012 Contractor: Cliff Collins; Lerner Corp Trust; Robert DikeClient: Lerner Corp Trust | Permit type: Electrical | Permit status: Permit issued | Permit id: E37657665 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeiledqi21ibegscck%2bvl%2bffbk Date: December 12, 2012Client: Washington Square Limited | Permit type: Electrical | Permit status: Permit issued | Permit id: E72156507 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildby1xcmnz2ddb0rockw43k Date: April 12, 2012Client: Lerner Enterprise | Permit type: Mechanical | Permit status: Completed | Permit id: Ar71263978 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildorznafkpquuiyzexwugjd Date: July 30, 2012Permit type: Plumbing and gas | Permit status: Completed | Permit id: P13052846 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildjkm1me%2foukz3po9twain4 Date: July 25, 2012 Contractor: David Raine; Lerner Enterprises; David RaineClient: Lerner Enterprises | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P27303126 | |||||
SCORE 56 After hours for paver replacement 6/25/12 to 7/14/12 mon thru sat 5am to 7pm permit # pa69974 Date: June 26, 2012 Contractor: Marty NifratkiClient: Washington Square Limited Partnership | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1200605 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilc5szjogaxc13xoym12gdy5 Date: June 28, 2013Client: Washington Square Lerner Group | Permit type: Electrical | Permit status: Permit issued | Permit id: E41031833 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilderlm6rdqtxu2v12rlb22z Date: July 13, 2013Client: Maria C Tripoli Leaner Corp | Permit type: Electrical | Permit status: Permit issued | Permit id: E55861939 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcprotncshjjuoni6i%2bdsr%2f Date: May 15, 2013Client: Washington Square Llp Lerner Corp | Permit type: Mechanical | Permit status: Completed | Permit id: Ar98982470 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilc8zxh6hjn%2bobg6ubdt1phm Date: May 15, 2013Client: Washington Sq Llp | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P94828391 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildy6xvsc7y1h32sdjkewidv Date: May 22, 2013 Contractor: Bernard Kalb; Lerner Corporation; Bernard KalbClient: Lerner Corporation | Permit type: Electrical | Permit status: Completed | Permit id: E88613387 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilemlvij383v57ru5trv5lok Date: July 12, 2013Client: Washington Square Llp- Lerner Corp | Permit type: Electrical | Permit status: Completed | Permit id: E95178143 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcbmoxvhecilikeytqevzld Date: August 23, 2013Client: Washington Squre Lerner Corp | Permit type: Electrical | Permit status: Completed | Permit id: E71187667 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfwcosbujftjgy8znlknp%2fm Date: October 30, 2014 Contractor: Gary Mcvey; William Breedlove; Gary McveyClient: William Breedlove | Permit type: Electrical | Permit status: Permit issued | Permit id: E65127683 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfmd%2fqecn3t8wyfchryo00e Date: December 11, 2014Client: Washington Square Limited Partnership | Permit type: Electrical | Permit status: Permit issued | Permit id: E13174710 | |||||
SCORE 89 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilee9njywu50yev9r7jrus8e Date: September 13, 2014 Contractor: Patrick Barron; Unknown Unknown; Robin MalleyClient: Unknown Unknown | Permit type: Electrical | Permit status: Permit issued | Permit id: E84952919 | |||||
SCORE 93 After hours permit for b1408858 from 10/14/2014 to 10/21/2014 4am-6am and 7pm-9pm Date: October 14, 2014 Contractor: Jopatric Love AmericodeClient: Lerner Corp. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500033 | |||||
SCORE 93 After hours permit for b1408858 from 10/22/2014 to 10/31/2014 3am to 7am Date: October 22, 2014 Contractor: Jopatric Love AmericodeClient: Lerner Corp. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500043 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilemm8dzco2u%2ffxiaq41nc%2fs Date: November 5, 2014Client: Lerner Corporation | Permit type: Electrical | Permit status: Completed | Permit id: E17021746 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeild73ov0wej6oiamcy%2fxy3va Date: November 20, 2014 Contractor: Jeff Wetzel; Leaner Corporation; Wayne ReepClient: Leaner Corporation | Permit type: Electrical | Permit status: Completed | Permit id: E28463453 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfyd1ixlbiz08e6q6xpzffg Date: November 14, 2014Client: Leaner Corporation | Permit type: Electrical | Permit status: Completed | Permit id: E44280908 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildu%2behw5hr1civmqsvxx310 Date: January 15, 2015Client: Transwestern Transwestern | Permit type: Electrical | Permit status: Completed | Permit id: E29526007 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildzzklv18dqcyy6fkr1nnw2 Date: January 15, 2015Client: Transwestern Transwestern | Permit type: Mechanical | Permit status: Completed | Permit id: Ar78735655 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildzzklv18dqc2q3jk%2fxvfvd Date: January 15, 2015 Contractor: Andrew Arntson; Transwestern .; Andrew ArntsonClient: Transwestern . | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P80071476 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilevsbxwapda0b%2fxfo0xwsjn Date: January 15, 2015Client: Washington Square Limited Partners | Permit type: Electrical | Permit status: Permit issued | Permit id: E62164618 | |||||
SCORE 59 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildsrti55o62lboaff37mnm%2f Date: September 17, 2015Client: Washington Square Limited Partnersh Washington Square Limited Pa | Permit type: Electrical | Permit status: Completed | Permit id: E99002959 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfg%2f7wm%2bavphpo4yqei%2fuz8 Date: October 16, 2015Client: Maria Tripoli | Permit type: Electrical | Permit status: Completed | Permit id: E12971099 | |||||
SCORE 95 Replace ex doors with stainles steel #4 hoistwary doors on floors p, ll, 5 & of (10) passenter and (2) shuttle elevators,. Re-cald the hoistway door entrances/frames/headers on same landings. Replace existing hall stations and lanterns on floors 5 &10. Replace baille on door jambs. Est. Cost of work 184,989. 53 Date: September 1, 2015 Contractor: Thyssenkrupp ElevatorClient: Lerner Properties | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1503174 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcf1tzgnuvzcddcsbfxgsir Date: August 22, 2015Client: Washington Square Association | Permit type: Electrical | Permit status: Permit issued | Permit id: E50933339 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeileni2e9cumuuukdmwk4gr5t Date: October 8, 2015Client: Lawrence Waterman Unispace | Permit type: Electrical | Permit status: Permit issued | Permit id: E73898371 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilelntive6i1aar0chvpblqq Date: December 5, 2015Client: Maria C. Tripoli | Permit type: Mechanical | Permit status: Permit issued | Permit id: Ar60033861 | |||||
SCORE 65 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilf7e%2fegyy6mpekhdnykmmfl Date: October 31, 2015 Contractor: Michael Heisey; Sam Hollen; Robert WattsClient: Sam Hollen | Permit type: Electrical | Permit status: Permit issued | Permit id: E76976923 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeileni2e9cumuunlgbgm6jh9h Date: December 9, 2015 Contractor: Lerner Lerner; Lerner Lerner; Joseph RichardsClient: Lerner Lerner | Permit type: Electrical | Permit status: Completed | Permit id: E71476071 | |||||
SCORE 59 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilez4nmv%2b8uhiss3bjbjwbz7 Date: February 12, 2015Client: Washington Square Limited Partnersh Washington Square Limited Pa | Permit type: Electrical | Permit status: Completed | Permit id: E56099773 | |||||
SCORE 59 Interior demolition permit d16001 space 1. After hours permit 01/06/16-02/05/16 - 8pm to 6am Date: January 6, 2016 Contractor: Shawna BartonClient: Maria Tripoli | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600276 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilef57qhsbddkrhxaq19br8b Date: April 8, 2016 Contractor: Andrew Arntson; Maria C Tripoli; Andrew ArntsonClient: Maria C Tripoli | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P78084658 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilflf6k13i1xle1hw7cplhro Date: March 10, 2016Client: Leaner Corporation | Permit type: Electrical | Permit status: Permit issued | Permit id: E25488853 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeiletoazkay%2fiubrxwej%2fburp Date: May 4, 2016Client: Maria Leaner Corp | Permit type: Electrical | Permit status: Permit issued | Permit id: E68891595 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/eservices. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcr8rq9rlocrmkfr2xjhmts Date: October 21, 2016 Contractor: Rocky Watts; Sam Hollen; Robert WattsClient: Sam Hollen | Permit type: Electrical | Permit status: Permit issued | Permit id: E78385577 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilemw2ac0avlkqquf%2fv4u4x0 Date: April 8, 2016Client: Lerner Lerner | Permit type: Electrical | Permit status: Completed | Permit id: E10602754 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfxuggljwoppfqe9iupyu1n Date: September 13, 2016Client: Washington Square Limited Partnership | Permit type: Electrical | Permit status: Completed | Permit id: E54184480 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilemw2ac0avlkqumeiu9l4xm Date: April 8, 2016Client: Maria C Tripoli | Permit type: Mechanical | Permit status: Completed | Permit id: Ar21111309 | |||||
SCORE 56 Welding of a fuel tank per permit b1201788 & b1512340- work on concurse level from 11pm to 7am from 01/19/16 to 02/18/16 jassi dhanjal- washington square management 202-296-2800, Date: January 13, 2016 Contractor: David Howell LernerClient: David Howell Lerner | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600288 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/eservices. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilcr8rq9rlocrgpfmlcr2rad Date: October 21, 2016Client: Maria C Tripoli Leaner Corp | Permit type: Electrical | Permit status: Permit issued | Permit id: E41272125 | |||||
SCORE 69 Interior renovation to 6th floor office space. Partitions, furniture, mep, and life safety. Spec suite 680, 6184 square feet. Spec 690, 3487 square feel. 9671 total square feet. Date: June 26, 2017 Contractor: Crystal HarringtonClient: Mario Tripoli | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700958 | |||||
SCORE 69 Working hours: 7pm - 7am. Interior renovation to 6th floor office space. Partitions, furniture, mep, and life safety. Spec suite 680, 6184 sq ft. Spec suite 690, 3487 sq ft. 9671 sq ft total. Date: July 21, 2017 Contractor: Crystal HarringtonClient: Mario Tripoli | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1701062 | |||||
Electrical Date: June 27, 2017Client: Washington Square Limited Partnership, Llc | Permit status: Permit issued | Permit id: E1707753 | |||||
SCORE 96 Mechanical Date: June 28, 2017 Contractor: David MovafaghClient: Maria C Tripoli | Permit status: Permit issued | Permit id: M1702828 | |||||
SCORE 96 Plumbing and gas Date: October 22, 2014 Contractor: Jay H SchwabClient: Maria C Tripoli | Permit status: Completed | Permit id: P1500598 | |||||
SCORE 88 Mechanical Date: October 22, 2014 Contractor: W.E. BowersClient: Maria C Tripoli | Permit status: Completed | Permit id: M1500206 | |||||
SCORE 88 Mechanical Date: October 22, 2014 Contractor: W.E. BowersClient: Maria C Tripoli | Permit status: Completed | Permit id: M1500206 | |||||
SCORE 96 Plumbing and gas Date: October 22, 2014 Contractor: Jay H SchwabClient: Maria C Tripoli | Permit status: Completed | Permit id: P1500598 | |||||
SCORE 88 Mechanical Date: October 22, 2014 Contractor: W.E. BowersClient: Maria C Tripoli | Permit status: Completed | Permit id: M1500206 | |||||
SCORE 96 Plumbing and gas Date: October 22, 2014 Contractor: Jay H SchwabClient: Maria C Tripoli | Permit status: Completed | Permit id: P1500598 | |||||
SCORE 88 Mechanical Date: October 22, 2014 Contractor: W.E. BowersClient: Maria C Tripoli | Permit status: Completed | Permit id: M1500206 | |||||
SCORE 96 Plumbing and gas Date: October 22, 2014 Contractor: Jay H SchwabClient: Maria C Tripoli | Permit status: Completed | Permit id: P1500598 | |||||
SCORE 83 Plumbing and gas Date: May 6, 2013 Contractor: Neftali D. VasquezClient: Maria C Tripoli | Permit status: Completed | Permit id: P1304790 | |||||
Plumbing and gas Date: October 21, 2014Permit status: Completed | Permit id: P1500531 | |||||
Plumbing and gas Date: June 18, 2015Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1506751 | |||||
SCORE 88 Mechanical Date: June 28, 2016 Contractor: W.E. BowersClient: Maria C Tripoli | Permit status: Permit issued | Permit id: M1602559 | |||||
SCORE 83 Plumbing and gas Date: May 6, 2013 Contractor: Neftali D. VasquezClient: Maria C Tripoli | Permit status: Completed | Permit id: P1304790 | |||||
Plumbing and gas Date: October 21, 2014Permit status: Completed | Permit id: P1500531 | |||||
SCORE 88 Mechanical Date: June 28, 2016 Contractor: W.E. BowersClient: Maria C Tripoli | Permit status: Permit issued | Permit id: M1602559 | |||||
Plumbing and gas Date: October 21, 2014Permit status: Completed | Permit id: P1500531 | |||||
SCORE 83 Plumbing and gas Date: May 6, 2013 Contractor: Neftali D. VasquezClient: Maria C Tripoli | Permit status: Completed | Permit id: P1304790 | |||||
Plumbing and gas Date: October 21, 2014Permit status: Completed | Permit id: P1500531 | |||||
Plumbing and gas Date: June 18, 2015Client: Maria C Tripoli | Permit status: Permit issued | Permit id: P1506751 | |||||
SCORE 88 Mechanical Date: June 28, 2016 Contractor: W.E. BowersClient: Maria C Tripoli | Permit status: Completed | Permit id: M1602559 | |||||
SCORE 96 Revision to issued permit b1409248 for changes to office layout. Original permit was issued for alterations to 49,0 sf of existing office space. Date: November 4, 2014 Contractor: David Fontana Mckeever Services CorpClient: Mmc Res Finance And Admin | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1410439 | |||||
SCORE 89 Interior only alteration to 49,0 sf of existing office space. New partition plan and associated mep included. Date: July 11, 2014 Contractor: Evan Obrien D Mckeever ServicesClient: Maria C Tripoli | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1409348 | |||||
SCORE 96 Electrical Date: July 23, 2014 Contractor: Herbert D LautClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1407456 | |||||
SCORE 96 Electrical Date: July 23, 2014 Contractor: Herbert D LautClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1407456 | |||||
SCORE 96 Electrical Date: July 23, 2014 Contractor: Herbert D LautClient: Maria C Tripoli | Permit status: Permit issued | Permit id: E1407456 |