Bikepath wo# 1406 Date: November 1, 2002 Permit id: 80-3673 | |||||
Bikepath 2" water connection Date: November 1, 2002 Permit id: 80-1011 | |||||
To be billed-telco contractor to rod and place pull rope Date: November 1, 2002 Permit id: 80-4065 | |||||
SCORE 100 Pm30445374 - pge to install 1-4" riser bend @ existing pole to approx east to existing stubbed 4" conduit coming from existing #5 box east - all work shall comply with city standards. All traffic control shall be in place. Call inspection line when working in the row. Date: September 1, 2005 Contractor: Pg And E Permit id: 05-1317 | |||||
Directional bore to install conduit, filed in west capitol av filew. Capitol, 5th st., & e st. Date: November 1, 2002 Permit id: 80-3999 | |||||
To be billed to w. O. # 1526 - lower splice box 2" - 3" to meet final grade of new sidewalk. All work shall comply to city standards. Date: October 22, 2003 Permit id: 03-0903 | |||||
W. O. #1608 Date: February 9, 2004 Permit id: 04-0126 | |||||
Replace street light pole in landscape strip. Date: March 7, 2003 Permit id: 03-0260 | |||||
Access to city property at w capitol ave. And enterprise blvd. Remove and replace bollards with removable bollards as per city standard #240. Any damage to existing city facilities to be repaired to original condition. Date: June 1, 2004 Permit id: 04-0599 | |||||
Trench installation of 12" petroleum product line at apn 08-010-27 and apn 08-010-29 Date: October 5, 2004 Permit id: 04-1178 | Parcel: 008010027000 | |||||
W. O. 1413 hydrvac and tv inspection of strom drain system on west capitol ave. Date: January 4, 2006 Permit id: 06-0008 | |||||
SCORE 62 W. O. 1413topographic survey o fwest capitol ave from harbor blvd to teh railroad underpass. All work shall comply with city standards and details. Prior to start of work call engineering inspection number at 916-617-4692. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refund. Date: January 19, 2006 Contractor: Nolte Associates, Inc Permit id: 06-0043 | |||||
W. O. 1726psip and west capitol ave. Area street rehabilitation projectall work in row shall be reported to inspection line - (916) 617-4692. All work in row will conform to current city standards and specs (2002). Final engineering encroachment inspection is required. Date: May 8, 2006 Permit id: 06-0270 | |||||
Wo#99309 utility company #prior to start of work: notify engineering inspection at 916-617-4692a. All work in row will conform to current city standards and specs (2002). Final engineering encroachment inspection is required. Utmz10 nad83. For transmission gas pipeline maintenance. Dig x12 bell hole to inspect gas transmission main. Nseg 116 sta 0+51. Wo#99022 Date: December 28, 2006 Permit id: 06-0949 | |||||
Wo#99022. Reference#pm30550452. Replacing street light pole with (2) 2 watt luminaires. Pole was hit by car in dec. 2006. Location: w capitol & pecan. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired Date: February 14, 2007 Permit id: 07-0128 | |||||
Wo# 14130. Phase 1: conduct 21 soil borings on travel way. Project site is bounded by harbor blvd. On the west and by garden st riske lane on the east. Traffic control will be provided by tmi and will be per caltrans standards. Phase 2: conduct ground penetrating radar testing covering both west-bound & east-bound lanes of w. Capitol ave between harbor blvd to jeff blvd and west-bound lanes of w cap ave between jeff blvd to approx 5 ft east of merkley ave. Date: June 12, 2007 Permit id: 07-0603 | |||||
Cip wo#1413. Phase 1 - 86 potholing to determine the location of underground utilities on west capitol ave. A preconstruction meeting is required to call (916) 617-4692. All work shall comply with city standards and details. W. Capitol ave-pothole proj phase 2. 142 potholes from w acre to harbor blvd. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: June 15, 2007 Permit id: 07-0653 |