Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Project incomplete - deposit moved 650-9320-4704 dchristmon - rec#13953,chk#25549 Date: November 1, 2002 Permit id: 80-3430 | |||||
SCORE 100 It is proposed to open cut in the sidewalk area n side reed ave a 4x47d bellhole in order to install a new 2 transmission pressure natural gas valve to replace the existing non operational 2" valve. It is also proposed to open cut in the paved area on the n side of reed ave a 4x4x 6d bellhole to abandon in place and wrap the existing non operational valve. Date: August 31, 2004 Contractor: Pg And E Permit id: 04-0964 | |||||
W. O. # 99022 utility company # n aa preconstruction meeting is required: call (916) 617-4692. All work in row will conform to current city standards and specs (2002). Final engineering encroachment inspection is required. Horizontal bore across stillwater rd. Install two (2) 4" conduits. Date: July 24, 2006 Permit id: 06-0521 | |||||
SCORE 100 Wo#99022. Pm 30558673. Dig a 45 trench to install fiberoptic cable on s e corner of stillwater. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: February 6, 2007 Contractor: Pg And E Permit id: 07-0115 | |||||
Wo#99022 pg&e pm30604290. Reconducting 115kv electric transmisison lines on stillwater rd and harbor blvd near home depot. (taffic control plan for lane closure attached)a pre-inspection is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: December 19, 2008 Permit id: 08-0368 |