Date: July 18, 2001Permit id: 01-07-070 | Parcel: 001010001000 | |||||
Construction of 20" petroleum pipeline along south river rd. Minimum cover of 5 feet. Construct as per city standard details and notes for civil plans and trenching. Requires one lane width of 2. 5 inchs grind and overlay. Date: February 13, 2004Permit id: 04-0187 | |||||
This permit is for 1. 5 inch drilling on s river road only. A flagger is required for traffic control. Concrete slurry mix will be used to backfill the holes. Engineering inspection will determine in the field what will be required for street repair. A seperate permit will be required to open s river road for pipeline repair. Fees for this permit will be collected with that permit. Permit 04-0187 and 04-0919 are still open and must be finaled prior to any new permits. 04-0187 & 04-0919 are Date: June 7, 2005Permit id: 05-0930 | |||||
W. O. 153010--borings south of the deep water channel along sout river road to locate existing utilities. All work shall comply with city standards and details. Prior to start of work call engineering inspection number at 916-617-4692. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refund. Date: December 21, 2005Permit id: 05-1564 | |||||
W. O. 1530. Potholing to locate chevron fuel line at apn 67-180-02city contact is jay davidson Date: September 20, 2006Permit id: 06-0660 | |||||
Drill one 8" boring for geotechenical soil survey for evaluation of levee stability. Upon completion the boring will be backfilled with grout in accordance with yolo county backfill guidelines. City contact person is cameron beebe. Gave pink copy of permit to cameron. Date: September 6, 2006Permit id: 06-0628 | |||||
Wo# 15 - south river rd. Bridge project. Contractor to dig 31 potholes for locating of utilities and restore pavement per city standard detail #110. Traffic control [see plans] shall be in place at all times. Notify city 48-hours prior to start of work. Inspection line: 916-617-4692 Date: October 5, 2006Permit id: 06-0746 | |||||
Wo#99309 utility company #prior to start of work: notify engineering inspection at 916 617-4692. All work in row will conform to current city standards and specs (2002). Final engineering encroachment inspection is required. Utm z10 nad83. Dig x 12 bell hole to inspect gas transmission main. Nseg 116 sta 3+56. (may or may not be dug depending on what is found with nseg 116 sta 0+51 dig @ w. Capitol av) Date: December 29, 2006Permit id: 06-0950 | |||||
Geotechnical boring approximate 14 feet south of burrow road. Boring to be backfilled with cement slurry and upper 6" with aggregate concrete. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired Date: January 16, 2007Permit id: 07-0061 | |||||
Repair wooden bridge structure to the holland branch railroad bridge at gregory lane and south river road. Road will be closed for 2 days. Traffic plan attacheda preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Date: February 6, 2007Permit id: 07-0117 | |||||
Wo#99022 utm z10 nad83. Dig 8 x bell hole to inspect gas transmission main at st 116-0+84. On s. River rd x hwy near 10 s. River rda preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: June 13, 2007Permit id: 07-0638 | |||||
Drill 6 7 8" holes in street at pipeline crossing for close interval survey. Repair with liguid grout and asphalt plugs. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: June 26, 2007Permit id: 07-0668 | |||||
SCORE 100 Wo#10002 pg&e to relocate + 3,1 feet of 6 inch high pressure gas line along south river road from ballpark dr going south to the proposed intersection of mill and fifth st. This work is being done to accommodate a city project "bridge district improvements". City project manager is toby wong. A pre-construction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Date: April 20, 2010 Contractor: Pg And EPermit id: 10-0144 | |||||
Wo#10002. Bridge district project - at&ts work consist of the removal of 19 poles, place 3 anchors; one which will require r&r of approx 16 sf of sidewalk. A pre-construction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Call 916 617-4692 any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: June 29, 2010Permit id: 10-0241 |