ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Date: June 20, 2003Permit id: 03-06-166 | Parcel: 058121002000 | |||||
Date: May 25, 2005Permit id: 05-05-265 | Parcel: 001010001000 | |||||
Date: August 31, 1998Permit id: 98-08-090 | Parcel: 046170001000 | |||||
Do not erase this record! - ss, jefferson blvd water main city project (w. O. 2519) Date: November 1, 2002Permit id: 80-3026 | |||||
Wo 1209 remove and replace power pool for jefferson widening project. Date: June 20, 2003Permit id: 03-0621 | Parcel: 058121002000 | |||||
SCORE 72 Jefferson blvd - w. O. 1524 pre-bid potholes for jefferson blvd widening ii. All work shall conform to city standards. Traffic control will be submitted to the city prior to working in the r. O. W. Date: August 27, 2003 Contractor: Granite ConstructionPermit id: 03-0791 | |||||
Directional bore to install conduites from existing pacific bell manhole to existing qwest manhole on sacramento ave and jefferson blvd. Directional bore to connect level 3 manhole and pacific bell manhole on triangle ct. All work shall conform to city standards. All appropriate traffic control shall be in place during construction. Date: October 21, 2003Permit id: 03-0901 | |||||
SCORE 86 Jefferson bl from highland to lake washington bl.; pothole 75 locations for verificaton of underground facilities in relation to city wo 1524 --contractor to submit traffic plan prior to work in right-of-way. Date: December 12, 2003 Contractor: Sbc Pacific BellPermit id: 03-1005 | |||||
W. O.# 1524 - jefferson blvd widening project expose and relocate 4 of buried cable due to city storm and sewer project. Buried cable will be placed back at 5 min depth after city project completion. Date: March 22, 2004Permit id: 04-0332 | |||||
SCORE 100 W. O. 1524 (jefferson widening project (city project) - pge to remove (7) seven power poles and install (5) power poles. Date: May 2, 2003 Contractor: Pg And EPermit id: 03-0443 | |||||
99022 install new electric cable in existing conduit. Install electric switches on existing pads, install electric switches appropriate traffic control will be used at all times while working in row. Call inspection line when final!!! Date: April 22, 2004Permit id: 04-0492 | |||||
99022 install new electric cable in existing conduit. Install transformers on existing pads. Appropriate traffic control will be used at all times while working in row. Call inspection line when final!!! Date: April 22, 2004Permit id: 04-0493 | |||||
99022 install new electric cable in existing conduit. Install transformers and switches on existing pads. Appropriate traffic control will be used at all times while working in row. Call inspection line when final!!! Date: April 22, 2004Permit id: 04-0494 | |||||
99015 directional bore, route as shown on attached drawings. Excavate & place 17x30x26 vaults, backfill per city standards. All work shall comply with city standards and specs. All appropriate traffic control shall be in place while working in row. Date: April 22, 2004Permit id: 04-0482 | |||||
SCORE 86 Relocate conduit & expose ducts as shown on approved plans. All work shall conform to city standard specifications, state traffic control, and all other regulations. Work order number 1524. Approved by cip - j. D. Date: May 25, 2004 Contractor: Sbc Pacific BellPermit id: 04-0580 | |||||
Emergency repair of pipeline at jefferson and 19th. Max 10x pit. Trench to be restored as per city standard detail or as directed by city inspector. Type "a" asphalt required. Open grade surface (0. 8 inch) to to replaced as per original specification. Open grade area to be 4 beyond pit area or as directed by city inspector. Grind method to be approved by city inspector. Compaction method as directed by city inspector. Road surface to be restored to original condition, including strip Date: August 11, 2004Permit id: 04-0925 | |||||
W. O. # 3323pipeline cleaning and tv inspection of sewer lines Date: January 21, 2005Permit id: 05-0105 | |||||
Bore 618 of 1-4" conduit in r w n s s. River rd e o gregory ave. Date: February 24, 2005Permit id: 05-0323 | |||||
SCORE 83 Installation of 2" secondary water meter downstream of pheasant hollow cfd 2" meter, and connection of jefferson irrigation controller wiring to pheasant hollow cfd controller. (wo 1524) Date: July 11, 2005 Contractor: City Of West SacramentoPermit id: 05-1061 | |||||
SCORE 83 2" water meter and backflow device for landscape irrigation of jefferson blvd. South of blacker rd. Date: August 24, 2005 Contractor: City Of West SacramentoPermit id: 05-1268 | |||||
W. O. 3325 jefferson tributary sanitary sewer rehabilitation projectall work in row shall be reported to inspection line at - (916) 617-4692. All work in r o w will conform to current city standards and specs (2002). Final engineering encroachment inspection is required. Date: March 28, 2006Permit id: 06-0184 | |||||
SCORE 100 Installation of new district regulation station at new r w on n w side of lake washington blvd. Also install new 6" plastic gas distribution line to intercept existing 6" pl gas main @ lake washington blvd. See attached dwg. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Cancelled permit per patricia Date: June 2, 2006 Contractor: Pg And EPermit id: 06-0372 | |||||
W. O. #utility company # a preconstruction meeting is required: call (916) 617-4692. All work in row will conform to current city standards and specs (2002). Final engineering encroachment inspection is required. Placing (3) intercept manholes over existing duct structure to access conduits. Date: June 9, 2006Permit id: 06-0404 | |||||
W. O. 99003job#5991333. Dig pit adjacent to existing sub-box. Bore 4 place 2 duct to pole behind 2237 kinsington. All work behind sidewalka preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: February 1, 2007Permit id: 07-0111 | |||||
Wo#62510. Barge canal access improvements. Asphalt road access and park equipment and fencing. A preconstruction meeting is required (chris surwaski--916 919-3577) all work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: July 23, 2007Permit id: 07-0723 | Parcel: 067180036000 | |||||
Manhole to be raised iron and asphalt to grade. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: August 10, 2009Permit id: 09-0232 |