Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Crane, boom, pump truck Date: April 26, 2011 Contractor: Marr Equipment Permit id: Cbp12236 | |||||
SCORE 100 Excavation Date: May 10, 2013 Contractor: James W Flett Company Permit id: Exc18097 | |||||
SCORE 100 Excavation Date: September 24, 2012 Contractor: James W Flett Company Permit id: Exc17434 | |||||
SCORE 100 Excavation Date: April 25, 2012 Contractor: Nstar Gas Permit id: Exc16922 | |||||
SCORE 100 Excavation Date: July 1, 2010 Contractor: Nstar Gas Permit id: Exc14558 | |||||
SCORE 100 Excavation Date: August 29, 2013 Contractor: Mattuchio Construction Permit id: Exc18464 | |||||
SCORE 100 Excavation Date: May 9, 2011 Contractor: James W Flett Company Permit id: Exc15616 | |||||
SCORE 100 Excavation Date: August 30, 2011 Contractor: Nstar Gas Permit id: Exc16062 | |||||
SCORE 100 Excavation Date: November 23, 2010 Contractor: James W Flett Company Permit id: Exc15162 | |||||
SCORE 100 The work proposed in this application is to repair the masonry foundation (selective repointing, and replacing of masonry), install footings for existing bearing wall, prepare for and install a new basement concrete slab (including insulation and vapor barrier), sister existing framing to bring framing system in conformance with irc, repair existing partition walls and bearing walls and sheather the exterior walls in preparationi for full renovation of building. Permit type: Addition/alteration | Completion date: September 14, 2017 | Current use: Two-family | Permit id: 0 | Parcel: 9787 |