Building Permits at 1 Center Pz Boston MA 02108


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1 Center Pz Boston MA 02108 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
82
Only one floor shall be impaired at any given time... Installation shall comply with the requirements of 7 cmr and nfpa 13.
Date:  March 10, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk448641 | Parcel: 0302713000
2015/03/100821 Center Pz Boston Ma 02108Boston Fire Sprinkler Co. Inc
Temporary bagging of smoke detectors
Date:  March 19, 2015

Permit status: Na | Permit id: Bsd454561 | Parcel: 0302713000
2015/03/190951 Center Pz Boston Ma 02108
SCORE
82
Installation shall comply with 7 cmr and nfpa 13...... Only one zone shall be impaired at any given time within the building.
Date:  May 4, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk463211 | Parcel: 0302713000
2015/05/040821 Center Pz Boston Ma 02108Boston Fire Sprinkler Co. Inc
SCORE
100
New office area connecting to existing system on the 3rd floor
Date:  June 3, 2015
Contractor: John Mclaughlin

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf472904 | Parcel: 0302713000
2015/06/0301001 Center Pz Boston Ma 02108John Mclaughlin
SCORE
82
Only one zone shall be impaired at any given time
Date:  February 18, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk445430 | Parcel: 0302713000
2015/02/180821 Center Pz Boston Ma 02108Boston Fire Sprinkler Co. Inc
Removal of asbestos
Date:  February 15, 2013

Permit status: Na | Permit id: Asb220795 | Parcel: 0302713000
2013/02/150951 Center Pz Boston Ma 02108
Temporary bagging of smoke detectors for dust control during construction
Date:  January 26, 2015

Permit status: Na | Permit id: Bsd443525 | Parcel: 0302713000
2015/01/260951 Center Pz Boston Ma 02108
Temporary placement of (1) dumpster for debris removal
Date:  July 1, 2013

Permit status: Na | Permit id: Td258674 | Parcel: 0302713000
2013/07/010951 Center Pz Boston Ma 02108
Installation of floo
Date:  August 13, 2015

Permit status: Na | Permit id: Chm500882 | Parcel: 0302713000
2015/08/130951 Center Pz Boston Ma 02108
Cutting &; welding;for modificationsrepairs to piping &;mechanical system (dpl) bfd paid detail required
Date:  May 25, 2010

Permit status: Na | Permit id: Cbw26467 | Parcel: 0302713000
2010/05/250951 Center Pz Boston Ma 02108
Installation of inte
Date:  August 7, 2015

Permit status: Na | Permit id: Chm500205 | Parcel: 0302713000
2015/08/070951 Center Pz Boston Ma 02108
Reno work to include drywall partations architectural finishes millwork doors frames. Hardware &; painting
Date:  March 19, 2015

Permit status: Na | Permit id: Fdc454560 | Parcel: 0302713000
2015/03/190951 Center Pz Boston Ma 02108
Selective demolition of gwb partitions and paint for tenant improvements
Date:  January 26, 2015

Permit status: Na | Permit id: Fdc443523 | Parcel: 0302713000
2015/01/260951 Center Pz Boston Ma 02108
To conduct the following: store propane tanks on site will be on fork truck once in storage (2) 33 lb propane tanks : applicant agrees on location of storage locker
Date:  May 26, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Gp474825 | Parcel: 0302713000
2015/05/260951 Center Pz Boston Ma 02108
To remove asbestos frm the garage vestibule
Date:  May 18, 2010

Permit status: Na | Permit id: Asb26347 | Parcel: 0302713000
2010/05/180951 Center Pz Boston Ma 02108
Installation of inte
Date:  September 11, 2013

Permit status: Na | Permit id: Chm284690 | Parcel: 0302713000
2013/09/110951 Center Pz Boston Ma 02108
To remove asbestos from the 1st floor
Date:  May 3, 2010

Permit status: Na | Permit id: Asb24119 | Parcel: 0302713000
2010/05/030951 Center Pz Boston Ma 02108
Mezzanine mec room
Date:  November 7, 2014

Permit status: Na | Permit id: Asb424182 | Parcel: 0302713000
2014/11/070951 Center Pz Boston Ma 02108
Cutting / burning / welding for modifications / repairs to base building piping and mechanical systems (dpl)
Date:  September 7, 2012

Permit status: Na | Permit id: Cbw179324 | Parcel: 0302713000
2012/09/070951 Center Pz Boston Ma 02108
Removal of asbestos
Date:  September 18, 2013

Permit status: Na | Permit id: Asb287104 | Parcel: 0302713000
2013/09/180951 Center Pz Boston Ma 02108
Removal of asbestos
Date:  August 12, 2013

Permit status: Na | Permit id: Asb273356 | Parcel: 0302713000
2013/08/120951 Center Pz Boston Ma 02108
Date:  May 1, 2014

Permit status: Na | Permit id: Asb358013 | Parcel: 0302713000
2014/05/010951 Center Pz Boston Ma 02108
To remove asbestos from the south wing - 6th floor electical room
Date:  July 26, 2010

Permit status: Na | Permit id: Asb35519 | Parcel: 0302713000
2010/07/260951 Center Pz Boston Ma 02108
Sidewalk ;deposit during removal of consrete sidewalk around support post to check for leakage; / deposit will be held until sidewalk is restored to a condition that;meets the standards of the ada and the city of boston; deposit; 1 000. 00
Date:  August 5, 2015

Permit type: Sidewalk deposit | Permit status: Na | Permit id: Sdep-503118 | Parcel: 0302713000
2015/08/050951 Center Pz Boston Ma 02108
Temporary bagging of smoke detectors for dust control during construction
Date:  August 19, 2013

Permit status: Na | Permit id: Bsd274946 | Parcel: 0302713000
2013/08/190951 Center Pz Boston Ma 02108
Interior demo &; renovations to include floor paint ceilings &; drywall
Date:  August 19, 2013

Permit status: Na | Permit id: Fdc274942 | Parcel: 0302713000
2013/08/190951 Center Pz Boston Ma 02108
Cutting &; burning;to heat drive sheave of the elevator to assist in the assembly of the armature to the drive sheave (dpl)
Date:  March 6, 2014

Permit status: Na | Permit id: Cbw341106 | Parcel: 0302713000
2014/03/060951 Center Pz Boston Ma 02108
;interior demo &; reno of common core hallways in 12 &; 3 center plaza
Date:  February 13, 2015

Permit status: Na | Permit id: Fdc447300 | Parcel: 0302713000
2015/02/130951 Center Pz Boston Ma 02108
Removal of asbestos;
Date:  September 12, 2012

Permit status: Na | Permit id: Asb182425 | Parcel: 0302713000
2012/09/120951 Center Pz Boston Ma 02108
Minor interior renovations to include drywall ceiling carpet and paint
Date:  February 5, 2010

Permit status: Na | Permit id: Fdc11903 | Parcel: 0302713000
2010/02/050951 Center Pz Boston Ma 02108
Temporary bagging of smoke detectors for dust control
Date:  February 1, 2010

Permit status: Na | Permit id: Bsd12827 | Parcel: 0302713000
2010/02/010951 Center Pz Boston Ma 02108
SCORE
82
Installing new fire alarm devices for renovation project at 1 2 & 3 center plaza
Date:  June 9, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf465278 | Parcel: 0302713000
2015/06/090821 Center Pz Boston Ma 02108Erica Burgos J And M Brown Company
SCORE
100
Install new lights receptacles and switches in office
Date:  March 10, 2010
Value:   $1,200
Contractor: John Mclaughlin

Client: Sri Ten Center Plaza Llc | Permit type: Electrical | Current use: Comm | Permit id: E17497 | Parcel: 302713000
2010/03/1012001001 Center Pz Boston Ma 02108John Mclaughlin
SCORE
100
Renovate partial floor
Date:  October 22, 2012
Value:   $190,000
Contractor: Michael Mcdonald

Client: Sri Ten Center Plaza Llc | Permit type: Electrical | Current use: Comm | Permit id: E189274 | Parcel: 302713000
2012/10/221900001001 Center Pz Boston Ma 02108Michael Mcdonald
SCORE
99
135 tel-data cabling locations
Date:  October 22, 2012
Value:   $30,000
Contractor: Dennis Obrien

Client: Sri Ten Center Plaza Llc | Permit type: Low voltage | Current use: Comm | Permit id: Elv191086 | Parcel: 302713000
2012/10/2230000991 Center Pz Boston Ma 02108Dennis Obrien
SCORE
75
Remove exsisting window unit and replace with a new window unit install new trim
Date:  October 10, 2014
Value:   $5,710
Contractor: John Defaria

Client: Sri Ten Center Plaza Llc | Permit type: Renovations - exterior | Current use: Comm | Permit id: Sf416023 | Parcel: 302713000
2014/10/105710751 Center Pz Boston Ma 02108John Defaria
SCORE
100
Minor electrical renovations to existing office
Date:  January 25, 2010
Value:   $5,000
Contractor: Jeffrey Catalano

Client: Sri Ten Center Plaza Llc | Current use: Comm | Permit id: E12115 | Parcel: 302713000
2010/01/2550001001 Center Pz Boston Ma 02108Jeffrey Catalano
SCORE
93
Garage elevator lobby renovations at 1 2 & 3 center plaza upper & lower lobbies consisting of new glass storefront new carpet new lighting and new flooring
Date:  July 14, 2014
Value:   $280,000
Contractor: Mark Price

Client: Sri Ten Center Plaza Llc | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf377134 | Parcel: 302713000
2014/07/14280000931 Center Pz Boston Ma 02108Mark Price
SCORE
100
Install fire alarm wiring in partial space
Date:  October 22, 2012
Value:   $8,000
Contractor: Michael Mcdonald

Client: Sri Ten Center Plaza Llc | Permit type: Fire alarm | Current use: Comm | Permit id: Efa189278 | Parcel: 302713000
2012/10/2280001001 Center Pz Boston Ma 02108Michael Mcdonald
SCORE
83
Enclose two existing desks with 7 high non-bearing sheetrock partitions painting flooring glass wood trim
Date:  February 9, 2010
Value:   $22,691
Contractor: Gary R Santini

Client: Sri Ten Center Plaza Llc | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf14301 | Parcel: 302713000
2010/02/0922691831 Center Pz Boston Ma 02108Gary R Santini
SCORE
87
Install 1 rio system &; 1 water filtration system on the 1st floor.
Date:  February 17, 2010
Contractor: Michael Mccready

Client: Sri Ten Center Plaza Llc | Permit type: Plumbing | Current use: Comm | Permit id: Pl14695 | Parcel: 302713000
2010/02/170871 Center Pz Boston Ma 02108Michael Mccready
SCORE
91
Renovations to suite 270 in one center plaza to include relocate doorway build one new office carpet and paint through out. Minor electrical as needed.
Date:  January 25, 2010
Value:   $50,000
Contractor: Urshula S Patel

Client: Sri Ten Center Plaza Llc | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf12134 | Parcel: 0302713000
2010/01/2550000911 Center Pz Boston Ma 02108Urshula S Patel
SCORE
100
Replace existing: 2 a v 2 strobe only 1 smoke detector and 1 remote indicator light
Date:  February 9, 2010
Value:   $1,500
Contractor: Jeffrey Catalano

Client: Sri Ten Center Plaza Llc | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa14222 | Parcel: 0302713000
2010/02/0915001001 Center Pz Boston Ma 02108Jeffrey Catalano
SCORE
91
Renovations to suite 2 in one center plaza to include relocate doorway build one new office carpet and paint through out. Minor electrical as needed.
Date:  January 25, 2010
Value:   $50,000
Contractor: Urshula S Patel

Client: Center Plaza As | Permit type: Short form bldg permit | Expiration date: July 25, 2010 | Current use: Comm | Permit id: Sf12134 | Parcel: 0302713000
2010/01/2550000911 Center Pz Boston MaUrshula S Patel
SCORE
82
Only one floor shall be impaired at any given time... Installation shall comply with the requirements of 7 cmr and nfpa 13.
Date:  March 10, 2015

Client: Center Plaza As | Permit type: Bfd sprinkler system | Permit id: Sprk448641 | Parcel: 0302713000
2015/03/100821 Center Pz Boston MaBoston Fire Sprinkler Co. Inc
SCORE
100
Renovate partial floor
Date:  October 22, 2012
Value:   $190,000
Contractor: Michael Mcdonald

Client: Center Plaza As | Permit type: Electrical permit | Expiration date: April 22, 2013 | Current use: Comm | Permit id: E189274 | Parcel: 0302713000
2012/10/221900001001 Center Pz Boston MaMichael Mcdonald
Temporary bagging of smoke detectors
Date:  March 19, 2015

Client: Center Plaza As | Permit type: Bfd bag smoke detectors | Permit id: Bsd454561 | Parcel: 0302713000
2015/03/190951 Center Pz Boston Ma
SCORE
82
Installation shall comply with 7 cmr and nfpa 13...... Only one zone shall be impaired at any given time within the building.
Date:  May 4, 2015

Client: Center Plaza As | Permit type: Bfd sprinkler system | Permit id: Sprk463211 | Parcel: 0302713000
2015/05/040821 Center Pz Boston MaBoston Fire Sprinkler Co. Inc
SCORE
100
New office area connecting to existing system on the 3rd floor
Date:  June 3, 2015
Contractor: John Mclaughlin

Client: Center Plaza As | Permit type: Bfd fire alarm installations | Permit id: Bfdf472904 | Parcel: 0302713000
2015/06/0301001 Center Pz Boston MaJohn Mclaughlin
Bfd asbestos removal
Date:  November 19, 2015

Client: Center Plaza As | Permit id: Asb540776 | Parcel: 0302713000
2015/11/190951 Center Pz Boston Ma
Temporary bagging of smoke detectors for dust control during demolition work
Date:  December 14, 2015

Client: Center Plaza As | Permit type: Bfd bag smoke detectors | Permit id: Bsd546636 | Parcel: 0302713000
2015/12/140951 Center Pz Boston Ma
Cutting / burning / welding connections for installation of new steel railings to accommodate masonry repairs (dpl) bfd paid detail required
Date:  December 23, 2015

Client: Center Plaza As | Permit type: Bfd cutting-burning-welding | Permit id: Cbw548051 | Parcel: 0302713000
2015/12/230951 Center Pz Boston Ma
SCORE
82
Only one zone shall be impaired at any given time
Date:  February 18, 2015

Client: Center Plaza As | Permit type: Bfd sprinkler system | Permit id: Sprk445430 | Parcel: 0302713000
2015/02/180821 Center Pz Boston MaBoston Fire Sprinkler Co. Inc
Removal of asbestos
Date:  February 15, 2013

Client: Center Plaza As | Permit type: Bfd asbestos removal | Permit id: Asb220795 | Parcel: 0302713000
2013/02/150951 Center Pz Boston Ma
SCORE
75
Remove exsisting window unit and replace with a new window unit install new trim
Date:  October 10, 2014
Value:   $5,710
Contractor: John Defaria

Client: Center Plaza As | Permit type: Short form bldg permit | Expiration date: April 10, 2015 | Current use: Comm | Permit id: Sf416023 | Parcel: 0302713000
2014/10/105710751 Center Pz Boston MaJohn Defaria
Temporary bagging of smoke detectors for dust control during construction
Date:  January 26, 2015

Client: Center Plaza As | Permit type: Bfd bag smoke detectors | Permit id: Bsd443525 | Parcel: 0302713000
2015/01/260951 Center Pz Boston Ma
Temporary placement of (1) dumpster for debris removal
Date:  July 1, 2013

Client: Center Plaza As | Permit type: Bfd temporary dumpster | Permit id: Td258674 | Parcel: 0302713000
2013/07/010951 Center Pz Boston Ma
SCORE
100
Minor electrical renovations to existing office
Date:  January 25, 2010
Value:   $5,000
Contractor: Jeffrey Catalano

Client: Center Plaza As | Permit type: Electrical permit | Expiration date: July 25, 2010 | Current use: Comm | Permit id: E12115 | Parcel: 0302713000
2010/01/2550001001 Center Pz Boston MaJeffrey Catalano
Bfd chemist certificate proces
Date:  August 13, 2015

Client: Center Plaza As | Permit id: Chm500882 | Parcel: 0302713000
2015/08/130951 Center Pz Boston Ma
Cutting &; welding;for modifications/repairs to piping &;mechanical system (dpl) bfd paid detail required
Date:  May 25, 2010

Client: Center Plaza As | Permit type: Bfd cutting-burning-welding | Permit id: Cbw26467 | Parcel: 0302713000
2010/05/250951 Center Pz Boston Ma
Bfd chemist certificate proces
Date:  August 7, 2015

Client: Center Plaza As | Permit id: Chm500205 | Parcel: 0302713000
2015/08/070951 Center Pz Boston Ma
Reno work to include drywall partations architectural finishes millwork doors frames. Hardware &; painting
Date:  March 19, 2015

Client: Center Plaza As | Permit type: Bfd construction demo reno | Permit id: Fdc454560 | Parcel: 0302713000
2015/03/190951 Center Pz Boston Ma
Selective demolition of gwb partitions and paint for tenant improvements
Date:  January 26, 2015

Client: Center Plaza As | Permit type: Bfd construction demo reno | Permit id: Fdc443523 | Parcel: 0302713000
2015/01/260951 Center Pz Boston Ma
To conduct the following: store propane tanks on site will be on fork truck once in storage (2) 33 lb propane tanks : applicant agrees on location of storage locker
Date:  May 26, 2015

Client: Center Plaza As | Permit type: Bfd general permit | Permit id: Gp474825 | Parcel: 0302713000
2015/05/260951 Center Pz Boston Ma
SCORE
99
135 tel-data cabling locations
Date:  October 22, 2012
Value:   $30,000
Contractor: Dennis Obrien

Client: Center Plaza As | Permit type: Electrical low voltage | Expiration date: April 22, 2013 | Current use: Comm | Permit id: Elv191086 | Parcel: 0302713000
2012/10/2230000991 Center Pz Boston MaDennis Obrien
SCORE
83
Enclose two existing desks with 7 high non-bearing sheetrock partitions painting flooring glass wood trim
Date:  February 9, 2010
Value:   $22,691
Contractor: Gary R Santini

Client: Center Plaza As | Permit type: Short form bldg permit | Expiration date: August 9, 2010 | Current use: Comm | Permit id: Sf14301 | Parcel: 0302713000
2010/02/0922691831 Center Pz Boston MaGary R Santini
To remove asbestos frm the garage vestibule
Date:  May 18, 2010

Client: Center Plaza As | Permit type: Bfd asbestos removal | Permit id: Asb26347 | Parcel: 0302713000
2010/05/180951 Center Pz Boston Ma
Bfd chemist certificate proces
Date:  September 11, 2013

Client: Center Plaza As | Permit id: Chm284690 | Parcel: 0302713000
2013/09/110951 Center Pz Boston Ma
To remove asbestos from the 1st floor
Date:  May 3, 2010

Client: Center Plaza As | Permit type: Bfd asbestos removal | Permit id: Asb24119 | Parcel: 0302713000
2010/05/030951 Center Pz Boston Ma
Mezzanine mec room
Date:  November 7, 2014

Client: Center Plaza As | Permit type: Bfd asbestos removal | Permit id: Asb424182 | Parcel: 0302713000
2014/11/070951 Center Pz Boston Ma
Cutting / burning / welding for modifications / repairs to base building piping and mechanical systems (dpl)
Date:  September 7, 2012

Client: Center Plaza As | Permit type: Bfd cutting-burning-welding | Permit id: Cbw179324 | Parcel: 0302713000
2012/09/070951 Center Pz Boston Ma
Removal of asbestos
Date:  September 18, 2013

Client: Center Plaza As | Permit type: Bfd asbestos removal | Permit id: Asb287104 | Parcel: 0302713000
2013/09/180951 Center Pz Boston Ma
SCORE
87
Install 1 rio system &; 1 water filtration system on the 1st floor.
Date:  February 17, 2010
Contractor: Michael Mccready

Client: Center Plaza As | Permit type: Plumbing permit | Expiration date: August 17, 2010 | Current use: Comm | Permit id: Pl14695 | Parcel: 0302713000
2010/02/170871 Center Pz Boston MaMichael Mccready
Removal of asbestos
Date:  August 12, 2013

Client: Center Plaza As | Permit type: Bfd asbestos removal | Permit id: Asb273356 | Parcel: 0302713000
2013/08/120951 Center Pz Boston Ma
SCORE
93
Garage elevator lobby renovations at 1 2 & 3 center plaza upper & lower lobbies consisting of new glass storefront new carpet new lighting and new flooring
Date:  July 14, 2014
Value:   $280,000
Contractor: Mark Price

Client: Center Plaza As | Permit type: Short form bldg permit | Expiration date: January 14, 2015 | Current use: Comm | Permit id: Sf377134 | Parcel: 0302713000
2014/07/14280000931 Center Pz Boston MaMark Price
Bfd asbestos removal
Date:  May 1, 2014

Client: Center Plaza As | Permit id: Asb358013 | Parcel: 0302713000
2014/05/010951 Center Pz Boston Ma
SCORE
100
Install new lights receptacles and switches in office
Date:  March 10, 2010
Value:   $1,200
Contractor: John Mclaughlin

Client: Center Plaza As | Permit type: Electrical permit | Expiration date: September 10, 2010 | Current use: Comm | Permit id: E17497 | Parcel: 0302713000
2010/03/1012001001 Center Pz Boston MaJohn Mclaughlin
To remove asbestos from the south wing - 6th floor electical room
Date:  July 26, 2010

Client: Center Plaza As | Permit type: Bfd asbestos removal | Permit id: Asb35519 | Parcel: 0302713000
2010/07/260951 Center Pz Boston Ma
Sidewalk ;deposit during removal of consrete sidewalk around support post to check for leakage; / deposit will be held until sidewalk is restored to a condition that;meets the standards of the ada and the city of boston; deposit; 1 000. 00
Date:  August 5, 2015

Client: Center Plaza As | Permit type: Sidewalk deposit | Permit id: Sdep-503118 | Parcel: 0302713000
2015/08/050951 Center Pz Boston Ma
Temporary bagging of smoke detectors for dust control during construction
Date:  August 19, 2013

Client: Center Plaza As | Permit type: Bfd bag smoke detectors | Permit id: Bsd274946 | Parcel: 0302713000
2013/08/190951 Center Pz Boston Ma
Interior demo &; renovations to include floor paint ceilings &; drywall
Date:  August 19, 2013

Client: Center Plaza As | Permit type: Bfd construction demo reno | Permit id: Fdc274942 | Parcel: 0302713000
2013/08/190951 Center Pz Boston Ma
Cutting &; burning;to heat drive sheave of the elevator to assist in the assembly of the armature to the drive sheave (dpl)
Date:  March 6, 2014

Client: Center Plaza As | Permit type: Bfd cutting-burning-welding | Permit id: Cbw341106 | Parcel: 0302713000
2014/03/060951 Center Pz Boston Ma
;interior demo &; reno of common core hallways in 12 &; 3 center plaza
Date:  February 13, 2015

Client: Center Plaza As | Permit type: Bfd construction demo reno | Permit id: Fdc447300 | Parcel: 0302713000
2015/02/130951 Center Pz Boston Ma
Removal of asbestos;
Date:  September 12, 2012

Client: Center Plaza As | Permit type: Bfd asbestos removal | Permit id: Asb182425 | Parcel: 0302713000
2012/09/120951 Center Pz Boston Ma
Minor interior renovations to include drywall ceiling carpet and paint
Date:  February 5, 2010

Client: Center Plaza As | Permit type: Bfd construction demo reno | Permit id: Fdc11903 | Parcel: 0302713000
2010/02/050951 Center Pz Boston Ma
Temporary bagging of smoke detectors for dust control
Date:  February 1, 2010

Client: Center Plaza As | Permit type: Bfd bag smoke detectors | Permit id: Bsd12827 | Parcel: 0302713000
2010/02/010951 Center Pz Boston Ma
SCORE
82
Installing new fire alarm devices for renovation project at 1 2 & 3 center plaza
Date:  June 9, 2015

Client: Center Plaza As | Permit type: Bfd fire alarm installations | Permit id: Bfdf465278 | Parcel: 0302713000
2015/06/090821 Center Pz Boston MaErica Burgos J And M Brown Company
SCORE
100
Install fire alarm wiring in partial space
Date:  October 22, 2012
Value:   $8,000
Contractor: Michael Mcdonald

Client: Center Plaza As | Permit type: Electrical fire alarms | Expiration date: April 22, 2013 | Current use: Comm | Permit id: Efa189278 | Parcel: 0302713000
2012/10/2280001001 Center Pz Boston MaMichael Mcdonald
Bfd asbestos removal
Date:  March 3, 2016

Client: Sri Ten Center Plaza Llc | Permit id: Asb568152 | Parcel: 0302713000
2016/03/030951 Center Pz Boston Ma
Sidewalk ;deposit during removal of consrete sidewalk around support post to check for leakage; ; deposit will be held until sidewalk is restored to a condition that;meets the standards of the ada and the city of boston; deposit; 1 000. 00
Date:  August 5, 2015

Client: Sri Ten Center Plaza Llc | Permit type: Sidewalk deposit | Permit id: Sdep-503118 | Parcel: 0302713000
2015/08/050951 Center Pz Boston Ma
Cutting &; welding;for modifications repairs to piping &;mechanical system (dpl) bfd paid detail required
Date:  May 25, 2010

Client: Sri Ten Center Plaza Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw26467 | Parcel: 0302713000
2010/05/250951 Center Pz Boston Ma
SCORE
98
Construction work for new tenant. Replace ceiling tiles replace carpeting replace office doors new overhead lighting.
Date:  March 18, 2016
Contractor: Peter Walsh

Client: Sri Ten Center Plaza Llc | Permit type: Bfd construction demo reno | Permit id: Fdc571782 | Parcel: 0302713000
2016/03/180981 Center Pz Boston MaPeter Walsh
SCORE
86
Installing new fire alarm devices for renovation project at 1 2 & 3 center plaza
Date:  June 9, 2015
Contractor: Erica Burgos

Client: Sri Ten Center Plaza Llc | Permit type: Bfd fire alarm installations | Permit id: Bfdf465278 | Parcel: 0302713000
2015/06/090861 Center Pz Boston MaErica Burgos
Cutting burning welding connections for installation of new steel railings to accommodate masonry repairs (dpl) bfd paid detail required
Date:  December 23, 2015

Client: Sri Ten Center Plaza Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw548051 | Parcel: 0302713000
2015/12/230951 Center Pz Boston Ma
Cutting burning welding for modifications repairs to base building piping and mechanical systems (dpl)
Date:  September 7, 2012

Client: Sri Ten Center Plaza Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw179324 | Parcel: 0302713000
2012/09/070951 Center Pz Boston Ma
Turn up sprinklers for demolitioned space for construction.; work per nfpa stands 7 cmr. One floor zone at a time. 2nd floor.
Date:  February 24, 2016

Client: Sri Ten Center Plaza Llc | Permit type: Bfd sprinkler system | Permit id: Sprk550269 | Parcel: 0302713000
2016/02/240951 Center Pz Boston Ma
SCORE
100
Replace existing: 2 a/v 2 strobe only 1 smoke detector and 1 remote indicator light
Date:  February 9, 2010
Value:   $1,500
Contractor: Jeffrey Catalano

Client: Sri Ten Center Plaza Llc | Permit type: Electrical fire alarms | Expiration date: August 9, 2010 | Current use: Comm | Permit id: Efa14222 | Parcel: 0302713000
2010/02/0915001001 Center Pz Boston MaJeffrey Catalano
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.