Building Permits at 1 7 Dalton St Boston MA


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1 7 Dalton St Boston MA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Ramp and turntable foundation. 300sf of mastic on foundation-around the base of the building-black tar
Date:  April 15, 2015

Client: Church Christ Of Science | Permit type: Bfd asbestos removal | Permit id: Asb462856 | Parcel: 0401150000
2015/04/150951 7 Dalton St Boston Ma
Bfd application tank removal
Date:  May 18, 2015

Client: Church Christ Of Science | Permit id: Bfdatr472857 | Parcel: 0401150000
2015/05/180951 7 Dalton St Boston Ma
Cutting / burning / welding for removal of existing underground steel sheeting during demolition excavation slurry wall and secant pile to accommodate new building foundation
Date:  March 26, 2015

Client: Church Christ Of Science | Permit type: Bfd cutting-burning-welding | Permit id: Cbw452026 | Parcel: 0401150000
2015/03/260951 7 Dalton St Boston Ma
Burning / welding;/ cutting;for installation of steel for slurry and secant wall foundations
Date:  May 28, 2015

Client: Church Christ Of Science | Permit type: Bfd cutting-burning-welding | Permit id: Cbw475705 | Parcel: 0401150000
2015/05/280951 7 Dalton St Boston Ma
Erect new 58 story 2 hotel guestroom and 185 residential unit building and 3 levels below grade on parcel 1a. Construction of a park on parcel 1b. Occupancy to be: 2 restaurant 2 cafe ; hotel with assembly 185 condo units ; retail space
Date:  June 19, 2015
Value:   $261,167,900

Client: Church Christ Of Science | Permit type: Erect/new construction | Expiration date: December 19, 2015 | Current use: Mixed | Permit id: Ert445126 | Parcel: 0401150000
2015/06/19261167900951 7 Dalton St Boston Ma
To conduct the following: for storage of four (4) 20lb and four (4) 40lb propane tanks to thaw frozen valves and slurry lines with hawk torches
Date:  December 22, 2015

Client: Church Christ Of Science | Permit type: Bfd general permit | Permit id: Gp548123 | Parcel: 0401150000
2015/12/220951 7 Dalton St Boston Ma
Thawing frozen slurry lines and valves with hawk torches to heat the steel beams hand held propane fueled. District fire chief restricts the usage to outdoors only.
Date:  January 4, 2016

Client: Church Christ Of Science | Permit type: Bfd cutting-burning-welding | Permit id: Cbw548823 | Parcel: 0401150000
2016/01/040951 7 Dalton St Boston Ma
Leak repair 5x4 roadway
Date:  February 8, 2015

Client: Church Christ Of Science | Permit type: Emergency excavation permit | Permit id: Emer-414476 | Parcel: 0401150000
2015/02/080951 7 Dalton St Boston Ma
SCORE
100
Erect 50x82 20x 20x and (2) 6x tents with 18" high elevated flooring and 12x 16x 24" high stage on 1/12/15. Removal on 1/15/15.
Date:  January 9, 2015
Value:   $50,000
Contractor: Mark Traina

Client: Church Christ Of Science | Permit type: Short form bldg permit | Expiration date: July 9, 2015 | Current use: Other | Permit id: Sf439850 | Parcel: 0401150000
2015/01/09500001001 7 Dalton St Boston MaMark Traina
SCORE
100
Pretrenching excavation saw cutting of building separation for installation of secant piles. Work is associated with ert 445126 under review with boston isd. All fees associated have been paid under ert445126. All work will be in full compliance with 780cmr 527cmr 521cmr and at the risk of owner.
Date:  March 5, 2015
Value:   $100
Contractor: Jack Moriarty

Client: Church Christ Of Science | Permit type: Short form bldg permit | Expiration date: September 5, 2015 | Current use: Comm | Permit id: Sf451778 | Parcel: 0401150000
2015/03/051001001 7 Dalton St Boston MaJack Moriarty
Tented event
Date:  January 15, 2015

Client: Church Christ Of Science | Permit type: Public event | Expiration date: January 14, 2015 | Permit id: Pub439849 | Parcel: 0401150000
2015/01/150951 7 Dalton St Boston Ma
To conduct the following: provide two (2) 125kw mq multiquip ultra-silent whisperwatt generators (1-isa back up) to power lighting catering and audio for special event. Equipment to be on site from 01/13-1/15/2015 event date is 01/14/2015. Each generator will have 175 gallons of diesel fuel stored in on board tanks.
Date:  January 12, 2015

Client: Church Christ Of Science | Permit type: Bfd general permit | Permit id: Gp439958 | Parcel: 0401150000
2015/01/120951 7 Dalton St Boston Ma
Under ground garage-tunnel--east side
Date:  April 27, 2015

Client: Church Christ Of Science | Permit type: Bfd asbestos removal | Permit id: Asb466182 | Parcel: 0401150000
2015/04/270951 7 Dalton St Boston Ma
Cutting only for removal of existing underground loading truck dock ramp &; slabs bfd paid detail required
Date:  March 5, 2015

Client: Church Christ Of Science | Permit type: Bfd cutting-burning-welding | Permit id: Cbw451393 | Parcel: 0401150000
2015/03/050951 7 Dalton St Boston Ma
507 x 8 [ sdwk ]; 507 x 12 [rdwy]; requires deposit during construction / this is not a permit to excavate occupy or install driveway openings - separate permits are required.; deposit will be held until the restored sidewaklks are inspected ;by a public works engineer to verify the correct slope and finish including ramps. [3]/.; permit; 60. 00; inspection; 500. 00; deposit; 113 400. 00
Date:  January 20, 2015

Client: Church Christ Of Science | Permit type: Sidewalk deposit | Permit id: Sdep-442194 | Parcel: 0401150000
2015/01/200951 7 Dalton St Boston Ma
Bfd application tank removal
Date:  February 18, 2015

Client: Church Christ Of Science | Permit id: Bfdatr447893 | Parcel: 0401150000
2015/02/180951 7 Dalton St Boston Ma
SCORE
100
Provide 2 -125kw generators (1- is a backup) to provide power for lighting catering heating and audio for a special event. We will also be supplying lighting for the tents.
Date:  January 8, 2015
Value:   $5,000
Contractor: Todd Gerrish

Client: Church Christ Of Science | Permit type: Electrical temporary service | Expiration date: July 8, 2015 | Current use: Vacld | Permit id: Ets439869 | Parcel: 0401150000
2015/01/0850001001 7 Dalton St Boston MaTodd Gerrish
Bfd chemist certificate proces
Date:  May 4, 2015

Client: Church Christ Of Science | Permit id: Chm461260 | Parcel: 0401150000
2015/05/040951 7 Dalton St Boston Ma
Demo to include removal of steel-framed truck turntable concrete loading dock &; ramp
Date:  March 5, 2015

Client: Church Christ Of Science | Permit type: Bfd construction demo reno | Permit id: Fdc451635 | Parcel: 0401150000
2015/03/050951 7 Dalton St Boston Ma
SCORE
96
Utility relocations excavations tree removal site clearing and testing. Also installation of site fence and mobilization of site work operations to the site.
Date:  December 17, 2014
Value:   $1,000,000
Contractor: James Grossmann

Client: Church Christ Of Science | Permit type: Short form bldg permit | Expiration date: June 17, 2015 | Current use: Comm | Permit id: Sf433655 | Parcel: 0401150000
2014/12/171000000961 7 Dalton St Boston MaJames Grossmann
Excavate to install pipe sleeves for slurry feed; / boston police area a; 343-4239; / no street closures; 7 am to 4 pm; / no street closures allowed;/ sdwk under deposit by general contractor
Date:  May 19, 2015

Client: Church Christ Of Science | Permit type: Excavation permit | Expiration date: May 29, 2015 | Permit id: Exca-473764 | Parcel: 0401150000
2015/05/190951 7 Dalton St Boston Ma
Cutting / burning / welding of steel for installation of slurry and secant wall foundation to accommodate building foundation
Date:  August 26, 2015

Client: Church Christ Of Science | Permit type: Bfd cutting-burning-welding | Permit id: Cbw496000 | Parcel: 0401150000
2015/08/260951 7 Dalton St Boston Ma
To conduct the following: tent for groundbreaking cocktail reception total cubic feet of project: 54400
Date:  January 14, 2015

Client: Church Christ Of Science | Permit type: Bfd tent with assembly | Permit id: Ta440371 | Parcel: 0401150000
2015/01/140951 7 Dalton St Boston Ma
To conduct the following: temporary heat for tent 01/14/2015 use of 24- 0 btu heaters w/48 40# propane tanks peterson party will have a man on site.
Date:  January 14, 2015

Client: Church Christ Of Science | Permit type: Bfd general permit | Permit id: Gp440375 | Parcel: 0401150000
2015/01/140951 7 Dalton St Boston Ma
SCORE
98
Consolidate various existing lots and subdivide a portion of land to create lot 1a consisting of 28 352 /- sq ft at ground level (26 107 /-sq ft above air rights notch ft above grade).; erect new 58-story (above grade) hotel and condominium apartment building with below grade parking garage
Date:  July 9, 2014
Contractor: Eric Cote

Client: Church Christ Of Science | Permit type: Board of appeals | Expiration date: July 9, 2016 | Current use: Comm | Permit id: Boa320086 | Parcel: 0401150000
2014/07/090981 7 Dalton St Boston MaEric Cote
Excavation and tank removal in association with sf451778 (and ert445126 currently under review with boston isd). All fees associated have been paid under ert445126.
Date:  April 6, 2015
Value:   $100

Client: Church Christ Of Science | Permit type: Short form bldg permit | Expiration date: October 6, 2015 | Current use: Comm | Permit id: Sf460014 | Parcel: 0401150000
2015/04/06100951 7 Dalton St Boston Ma
Construction of a sixty story high rise building
Date:  February 20, 2015

Client: Church Christ Of Science | Permit type: Bfd construction demo reno | Permit id: Fdc448434 | Parcel: 0401150000
2015/02/200951 7 Dalton St Boston Ma
Temporary placement of (1) dumpster for debris removal from construction work
Date:  February 20, 2015

Client: Church Christ Of Science | Permit type: Bfd temporary dumpster | Permit id: Td448398 | Parcel: 0401150000
2015/02/200951 7 Dalton St Boston Ma
SCORE
100
Remove loading dock obstruction for foundation installation as per sk ad-201
Date:  April 10, 2015
Value:   $100
Contractor: Jack Moriarty

Client: Church Christ Of Science | Permit type: Short form bldg permit | Expiration date: October 10, 2015 | Current use: Comm | Permit id: Sf460249 | Parcel: 0401150000
2015/04/101001001 7 Dalton St Boston MaJack Moriarty
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.