| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 R&r curb & gutter, sidewalks & drive cut, install grease interceptor. Traffic control 2 weeks Date: August 2, 2006 Contractor: Lightning Ventures IncClient: Of State | Applicant: Lightning Ventures, Inc. | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 59 Install 8" fire hydrant run for cu practice bubble. Tap in easement north of field Date: October 25, 2007 Contractor: Arapahoe Utilities And InfrastructureClient: Of State | Applicant: Arapahoe Utilities & Infrastructure | Permit type: Water, right-of-way | Permit status: Iss | |||||
SCORE 78 To do 4 potholes for cu on regent Date: August 5, 2008 Contractor: Dakota Drilling IncClient: R Name | Applicant: Dakota Drilling Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Temporary capture of westbound through lane for matfootls staging and loading unloading. (initial phase thru end of june foot09) (permit extended thru anticipated completion date: end of aug. 2010) Date: April 7, 2009 Contractor: Saunders Construction IncClient: R Name | Applicant: Saunders Construction Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Install street light Date: August 25, 2009 Contractor: Xcel EnergyClient: Of State | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Remove replace asphalt and restripe regent dr in front of new center for community -- traffic control under pmt2009-00973 Date: March 19, 2010 Contractor: Saunders Construction IncClient: R Name | Applicant: Saunders Construction Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 91 Installation of new curb & gutter alignment and associated sidewalk and drivepan Date: March 19, 2010 Contractor: Christopher Concrete IncClient: R Name | Applicant: Christopher Concrete Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Install new street light. Joe paulson Date: May 21, 2010 Contractor: Xcel EnergyClient: R Name | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 56 Locate and raise buried storm sewer manhole in regent drive adjacent to coors events center Date: June 10, 2010 Contractor: Guildner Pipeline Maintenance IncClient: Of State | Applicant: Guildner Pipeline Maintenance, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Installation of a new temporary crosswalk at regent and business school loop Date: June 23, 2010 Contractor: Saunders Construction IncClient: Of State | Applicant: Saunders Construction Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 99 Cu basketball volleyball practice facility utilities infrastructure relocation and improvements: new fire hydrant (private), relocated storm sewer anderson ditch lateral (req ditch co. Approval), place a box-base storm manhole in regent, surface improvements. Date: June 24, 2010 Contractor: Total Site Utilities IncClient: Of State | Applicant: Total Site Utilities, Inc. | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Crane lift set-up on multi-use path, (flagged), adjacent to campus at the museum bldg. For window replacement. (lift to be stored on-property overnight) Date: October 21, 2010 Contractor: Harley Keeter Jr Trucking IncClient: Of State | Applicant: Harley Keeter Jr Trucking, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 99 Row occupancy for crane set-up, re: emergency tree pruning trimming removal adjacent to cu, s. Side of university nw of macky auditorium - cob forestry - patrick bohin Date: February 17, 2011 Contractor: Ironwood Earthcare IncClient: Of State | Applicant: Ironwood Earthcare, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Remove replace sidewalk and curb & gutter adjacent to the new cu bball vball practice facility Date: May 10, 2011 Contractor: Pcl Construction Services IncClient: Of State | Applicant: Pcl Construction Services Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 81 Tap install (2) new 6inch sanitary sewer services to serve newly expanded jila bldg on cu campus Date: May 18, 2011 Contractor: Diamond Contracting CorpClient: Of State | Applicant: Diamond Contracting Corp | Permit type: Wastewater, right-of | Permit status: Iss | |||||
SCORE 100 Replace street light that was hit by car. Date: June 13, 2012 Contractor: Xcel EnergyClient: R Name | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Temporary capture of westbound through lane for matfootls staging and loading unloading. (initial phase thru end of june foot09) (permit extended thru anticipated completion date: end of aug. 2010) Date: April 7, 2009 Contractor: Saunders Construction IncClient: R Name | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2009-00973 | |||||
Install street light Date: August 25, 2009Client: Of State | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2009-03190 | |||||
Replace street light that was hit by car. Date: June 13, 2012Client: R Name | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-02798 | |||||
SCORE 100 Remove replace asphalt and restripe regent dr in front of new center for community -- traffic control under pmt2009-00973 Date: March 19, 2010 Contractor: Saunders Construction IncClient: R Name | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-00946 | |||||
Install new street light. Joe paulson Date: May 21, 2010Client: R Name | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-01943 | |||||
SCORE 56 Locate and raise buried storm sewer manhole in regent drive adjacent to coors events center Date: June 10, 2010 Contractor: Guildner Pipeline Maintenance, IncClient: Of State | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-02216 | |||||
SCORE 100 Installation of a new temporary crosswalk at regent and business school loop Date: June 23, 2010 Contractor: Saunders Construction IncClient: Of State | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-02307 | |||||
SCORE 95 Cu basketball volleyball practice facility utilities infrastructure relocation and improvements: new fire hydrant (private), relocated storm sewer anderson ditch lateral (req ditch co. Approval), place a box-base storm manhole in regent, surface improvements. Date: June 24, 2010 Contractor: Total Site Utilities, IncClient: Of State | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-02368 | |||||
SCORE 95 Crane lift set-up on multi-use path, (flagged), adjacent to campus at the museum bldg. For window replacement. (lift to be stored on-property overnight) Date: October 21, 2010 Contractor: Harley Keeter Jr Trucking, IncClient: Of State | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-04526 | |||||
SCORE 95 Row occupancy for crane set-up, re: emergency tree pruning trimming removal adjacent to cu, s. Side of university nw of macky auditorium - cob forestry - patrick bohin Date: February 17, 2011 Contractor: Ironwood Earthcare, IncClient: Of State | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2011-00656 | |||||
SCORE 56 R&r curb & gutter, sidewalks & drive cut, install grease interceptor. Traffic control 2 weeks Date: August 2, 2006 Contractor: Lightning Ventures, IncClient: Of State | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2006-03067 | |||||
SCORE 59 Install 8inch fire hydrant run for cu practice bubble. Tap in easement north of field Date: October 25, 2007 Contractor: Arapahoe Utilities And InfrastructureClient: Of State | Permit type: Water, right-of-way | Permit status: Iss | Permit id: Pmt2007-04770 |