1 - x tent 1 - kw generator Date: January 17, 2013Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1300084 | |||||
1 - x tent 1 - kw generator Date: January 17, 2013Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1300084 | |||||
SCORE 96 1 - x tent 1 - kw generator Date: January 17, 2013 Contractor: Paul E WarrenClient: District Of Columbia | Permit type: Electrical | Permit status: Permit issued | Permit id: E1302426 | |||||
The proposed work consists of drilling 7 soil borings on private property. Borings will be installed using a geo probe rig utilizing direct push technology - dpt - driving 2 inch geo probe rods. The borings diameter is 2 inches by feet deep. Drilling methods bentonite slurry mixture with 2 lbs, bentonite powder one gallon water, as per site plan, work plan report, dc well construction application and dc well schematic forms. All work will be performed under the ddoe regulations Date: April 30, 2014Client: Mission First Hoc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400274 | |||||
8 soil borings. Temporary geotechnical soil borings. 60ft depth, drilling method 3 1/4 hsa. Hole diameter 5inches Date: March 28, 2014Client: Golden Rule Plaza | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400232 | |||||
The proposed work consists of drilling 7 soil borings on private property. Borings will be installed using a geo probe rig utilizing direct push technology - dpt - driving 2 inch geo probe rods. The borings diameter is 2 inches by feet deep. Drilling methods bentonite slurry mixture with 2 lbs, bentonite powder one gallon water, as per site plan, work plan report, dc well construction application and dc well schematic forms. All work will be performed under the ddoe regulations Date: April 30, 2014Client: Mission First Hoc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400274 | |||||
1 - x tent 1 - kw generator Date: January 17, 2013Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1300084 | |||||
1 - x tent 1 - kw generator Date: January 17, 2013Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1300084 | |||||
SCORE 96 1 - x tent 1 - kw generator Date: January 17, 2013 Contractor: Paul E WarrenClient: District Of Columbia | Permit type: Electrical | Permit status: Permit issued | Permit id: E1302426 | |||||
The proposed work consists of drilling 7 soil borings on private property. Borings will be installed using a geo probe rig utilizing direct push technology - dpt - driving 2 inch geo probe rods. The borings diameter is 2 inches by feet deep. Drilling methods bentonite slurry mixture with 2 lbs, bentonite powder one gallon water, as per site plan, work plan report, dc well construction application and dc well schematic forms. All work will be performed under the ddoe regulations Date: April 30, 2014Client: Mission First Hoc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400274 | |||||
The proposed work consists of drilling 7 soil borings on private property. Borings will be installed using a geo probe rig utilizing direct push technology - dpt - driving 2 inch geo probe rods. The borings diameter is 2 inches by feet deep. Drilling methods bentonite slurry mixture with 2 lbs, bentonite powder one gallon water, as per site plan, work plan report, dc well construction application and dc well schematic forms. All work will be performed under the ddoe regulations Date: April 30, 2014Client: Mission First Hoc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400274 | |||||
The proposed work consists of drilling 7 soil borings on private property. Borings will be installed using a geo probe rig utilizing direct push technology - dpt - driving 2 inch geo probe rods. The borings diameter is 2 inches by feet deep. Drilling methods bentonite slurry mixture with 2 lbs, bentonite powder one gallon water, as per site plan, work plan report, dc well construction application and dc well schematic forms. All work will be performed under the ddoe regulations Date: April 30, 2014Client: Mission First Hoc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400274 | |||||
8 soil borings. Temporary geotechnical soil borings. 60ft depth, drilling method 3 1/4 hsa. Hole diameter 5inches Date: March 28, 2014Client: Golden Rule Plaza | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400232 | |||||
8 soil borings. Temporary geotechnical soil borings. 60ft depth, drilling method 3 1/4 hsa. Hole diameter 5inches Date: March 28, 2014Client: Golden Rule Plaza | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400232 | |||||
8 soil borings. Temporary geotechnical soil borings. 60ft depth, drilling method 3 1 4 hsa. Hole diameter 5inches Date: March 28, 2014Client: Golden Rule Plaza | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400232 | |||||
8 soil borings. Temporary geotechnical soil borings. 60ft depth, drilling method 3 1 4 hsa. Hole diameter 5inches Date: March 28, 2014Client: Golden Rule Plaza | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400232 | |||||
Police candlelight vigil 8-10x tents mobile stage and 2 generators, two mobile screens Date: May 11, 2016Client: Candlelight Vigile | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600131 | |||||