QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 7941 18th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. Ufer ground. ] adding solar power (8. 84 kw, roof mounted) 7/ m. Lee,service and basement works had done w/o permit,contractor and permit is required 5/21/15 hkh; renewal Date: May 22, 2014 Contractor: Zhang YuePermit type: Electrical | Permit status: Permit issued | Expiration date: May 22, 2015 | Current use: Single family / duplex | Permit id: 6419259 |