QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 75 99999 College St, Asheville, Nc 28801 Office trailer for yates construction, using 20kw generator, 7-18-2016 thru 10-31-16 ref 14-15444 for building permit; Date: July 18, 2016 Contractor: Yates And Sons Construction Company W. GClient: Ac Hotels | Permit type: Construction trailer | Permit status: Plan check | Current use: Commercial | Permit id: 16-07854 | Parcel: 212464 | |||||
SCORE 75 Date: June 11, 2015 Contractor: Yates And Sons Construction Company W. GClient: Ac Hotel Asheville | Permit type: Com: construction staging | Permit status: Partial issued | Current use: Commercial | Permit id: 15-01086 | Parcel: 212464 | |||||
SCORE 75 Broadway St, Asheville, Nc 28801 Existing building may remain the same street address assignment of 16 broadway st or if desired a lower building number like or 8 or 6 are also available. Revised plans should reference broadway suffix abbreviation as st and note the pre-directional of n for market st. Applicant to submit proposed address assignment scheme to my attention prior to submitting plans for final trc review. First floor to use 1 series numbers, second floor to use 2 series numbers and so forth. Swr june 17 2014 ; ac hotel final trc submittal; rec hrc minor for construction fencing; rec. Final trc response letter; still awaiting trc conditioned address assignment scheme. Swr august 2015; rec amendment, revised 2nd fire line connection route and connection point in college st., sanitary tie at the sw corner of college st. Adc. Date: February 23, 2015 Contractor: Yates And Sons Construction Company W. GClient: Ac Hotel | Permit type: Planning level ii | Permit status: Issued | Current use: Development | Permit id: 14-08231pz | Parcel: 212464 | |||||
SCORE 75 Date: September 15, 2016 Contractor: Yates And Sons Construction Company W. GClient: Ac Hotels Marriott | Permit type: Stand alone sign | Permit status: Issued | Current use: Sign | Permit id: 16-06264 | Parcel: 212464 | |||||
SCORE 75 Broadway St, Asheville, Nc 28801 Ac hotel asheville-new 9 story hotel and garage-mastersite permit 14-8231pz; amendment rec. Soil nail preliminary detail and foundation permit request; partial permit - foundation only including underground utilities (mep) footings, slabs, soil nail walls. Safeguards during construction per chapter 33 of the 2012 ncbc to be maintained at all times. 2/20/15 mm.; rec amendment giving cost of foundation work and listing that the subs for the pme under slab are to be determined;will submit names at later date;sls; they have requested to pay their msd payment at the the of their shell permit release. I have a call into kevin johnson, today we need to release their foundation only permit with a hold that the shell permit cant be release until the payment is made to msd. Call me if you need me. Thanks! Sent from my iphone; rec amendment plans for final soil nail wall;sls; authorized agents for yates: rick barker and neil barschefski are authorized to apply for and sign for permits on yates be Date: April 28, 2015 Contractor: Yates And Sons Construction Company W. GClient: Ac Hotel Asheville | Permit type: Com: warm shell | Permit status: Issued | Current use: Commercial | Permit id: 14-15444 | Parcel: 212464 | |||||
SCORE 75 Contractor: Yates And Sons Construction Company W. GClient: Ac Hotel Asheville | Permit type: Fire prevention | Permit status: Issued | Current use: Fire | Permit id: 14-15448 | Parcel: 212464 | |||||
SCORE 75 Broadway St, Asheville, Nc 28801 24th, concrete slab placement begins 12 am until 8 am/adding june 27,29,30th to the after hours, adding tuesday july 7 and wednesday july 8 for mat slab pour, adding july15th at 11:00pm-july 17th for concrete work after hours pending weather conditions-amended to include elevated concrete pour #3 during 4: am-9:00am on 9/3/15. Adding concrete pour 4 on 9/18/15 from 1: am- 5: am. 11/13/15 adding concrete pour from 12 am-5:00p, adding concrete placement 12/8-12/9 from 12: am-5:00am, adding concrete pour for 1/5/2016 from 3:00am-7: am. Adding additional date for 1/15/16 from 3: am- 7:00am. Adding additional work after hours for 1/27/16 from 2:00am-7:00am. Adding dates for march 18th and 25the for concrete pours from 2: am-7:00am, removing two trees on 6/28 at 6: am Date: June 17, 2015 Contractor: Yates And Sons Construction Company W. GClient: Ac Hotel Asheville | Permit type: Work after hours | Permit status: Issued | Current use: Over the counter | Permit id: 15-08052 | Parcel: 212464 |