QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 Salt Lake City Ut 84111 Kill 11 water laterals at the main and install 3 new water laterals. This will probably require removing a portion of 5 concrete panels in main street. Full panel replacement is not required. Install valves where they will not conflict with the storm drain that okland will install. The concrete street restoration can wait until after okland installs the storm drain. Engineering fees for upac work will be collected directly from rda. Sage 801-898-9852. Date: August 18, 2015 Contractor: Upac Water Killssage MccormickPermit type: Right of way | Permit status: Under warranty | Completion date: August 10, 2015 | Current use: Right of way | Permit id: Eng2015-01254 |