QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 Ne 76th Street Ne Redmond, Wa 98052 Phase 1 - placement of a missing segment of perimeter concrete sidewalk that will require removal of existing ground cover and the relocation of an existing utility access location. Phase 2 - demolition of existing asphalt pads whose location ties partially with the right-of-way. These pads provide pedestrian access to the parking lot from the sidewalk and will be relocated for the same purpose. These locations are noted on the proposed plan. Also/ a 42-inch high perimeter fence will be installed. Date: August 15, 2014 Contractor: Steve BenjaminApplicant: William Strouse | Permit type: Right of way | Permit id: Row-2014-06193 | Parcel: 2212950040 |