QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 71 0 Anacostia Ave Ne, Washington, Dc 20019 The anacostia riverwalk kinleworth trail section is a proposed multi-use trail, approximately 3. 9-miles in length. It originates beneath the benning rd bridge in washington d. C. At its southern point and extends northward along the east bank of the anacostia river before terminating at the bladensburg path in the bladensburg waterfront parkin p. G county maryland. The project includes 3 miles of asphalt pathway, four prefabricated truss pedestrian bridges, 1 linear feet of retaining wall, and 1,1 linear of heavy duty boardwalk. Date: May 22, 2013 Contractor: Rick MaddoxClient: District Department Of Transportation | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1101307 | |||||
SCORE 71 Date: June 24, 2014 Contractor: Rick MaddoxClient: District Department Of Transportation | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1408915 | |||||
SCORE 71 Date: November 20, 2014 Contractor: Rick MaddoxClient: District Department Of Transportation | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1501775 | |||||
SCORE 71 Date: May 5, 2015 Contractor: Rick MaddoxClient: District Department Of Transportation | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1507183 |