QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 646 Nw 86th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing a 3. 705kw ptc photo-voltaic system on our roof. The system includes ironridge xlr racking, solarworld panels, and enphase mircroinverters. Date: August 19, 2014 Contractor: Ray TylerPermit type: Electrical | Permit status: Permit closed | Completion date: October 27, 2014 | Expiration date: August 19, 2015 | Current use: Single family / duplex | Permit id: 6432556 |