QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 1023 Bladensburg Rd Ne, Washington, Dc 20002 Seven 6-inch diameter soil test borings will be drilled using 2. 25-inch continuous hollow stem flight augers. The borings will extend to a maximum depth of feet below current site grade. The samples will be containerized in glass jars for geotechnical classification and laboratory testing. The borings will be left open for a period of 24 hours to collect groundwater information. Pvc pipe will be inserted into the holes at the completion of drilling. The pvc pipes will be capped to prevent runoff from entering the bore holes. After groundwater reading the boreholes will be grouted with bentonite slurry 2 lbs of bentonite to 1 gallon of water and the auger cuttings and all other investigation derived waste will be containerized in sealed drums per ddoe permit. Date: November 17, 2016 Contractor: Na 1021 Bladensburg Rd Bl LlcClient: Na 1021 Bladensburg Rd Bl Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700023 |