SCORE 56 Salt Lake City Ut 84116 Sewer and storm drain connections into 5 north for the macland subdivision. Restore asphalt per apwa std. Plan 255. Restore concrete with 7. 5 bag mix if done before march 1. This bond provides a 3-year warranty for the street cut. Dave larsen 801-580-2050. Date: January 19, 2017 Contractor: Macland Subdivisiondave LarsenPermit type: Right of way | Permit status: Passed warranty | Completion date: January 20, 2014 | Current use: Right of way | Permit id: Eng2014-00044 |