QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 27 Martin Luther King Jr. Ave Se 20032 Washington Dc 27 block of martin luther king jr. Avenue se. This work is referenced as issued ddot permits pa10412674-r1 and pa10395049, test pitting at mlk jr. Ave. And cypress st. Se and alabama ave. And 12th street se. Supports st. Elizabeths east campus infrastructure project. Test pitting work at intersections of mlk and cypress st. Se and alabama ave. And 12th st. Se to support st. Elizabeths east campus infrastructure project. On alabama ave. Se, will close the westbound parking lane at the intersection with 12th street se. On mlk, the 2 eastbound travel lanes will be closed at the intersection with cypress st. Se. For test pitting activities. Expect to only need 4-5 working days for each closure. Date: July 26, 2017 Contractor: John B MccainClient: District Department Of General Services | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1701093 | |||||
SCORE 59 27 Martin Luther King Jr. Ave Se 20032 Washington Dc St. Elizabeths east campus stage 1, phase 1 infrastructure improvements project consists of the redevelopment of roadways and utilities to serve an approximately 35-acre portion of the campus. The improvements include the construction of roadways and associated utility infrastructure. Including water, sanitary sewer, storm drainage, dry utility infrastructure, stormwater management lid facilities, erosion & sediment control three traffic signals, and survey support services. No actual building construction is included in stage 1, phase 1, but the demolition of four small buildings is within the project scope. Date: July 28, 2017 Contractor: John B MccainClient: District Department Of General Services | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1701105 |