QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 Lowell St Cambridge, Ma Turn existing spare bedroom into master bath. Demo existing closet and spare bedroom down to studs. Demo plumbing, electrical, icynene spray foam, blueboard, tile and paint. Add 2 sinks walkin shower and separate tub and toilet. Remove trim from 4 openings on first floor and raise header height to 8 ft.. Paint entire interior Permit type: Addition/alteration | Completion date: August 14, 2015 | Current use: One-family | Parcel: 22114 |