QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 61 655 New York Avenue Nw Washington Dc Phase 2 to add additional scope to approved pa 97329 to extend the streetscape previously approved by the public space committee for the western half of the square to the eastern half including closing eight curb cuts while adding no new additional, new sidewalk pavers, new brick sidewalk, new trees and tree spaces, new streetlights, and new bike racks and ada ramps. Copy of previously approved work plan page, issued phase 1 construction permit, psc approval letter and issued and approved occupancy permit and traffic control plan included for reference. Date: February 19, 2016Permit type: Paving; ada curb ramp, paving; curb & gutter | Permit status: Revise and resubmit | Expiration date: May 31, 2017 | |||||
SCORE 61 655 New York Avenue Nw Washington Dc Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway(s) close existing, paving; sidewalk (porous pervious), paving; sidewalk(s), fixture; bike rack(s), landscaping; new tree space(s), landscaping; tree planting Permit status: 10 | Expiration date: May 31, 2017 | Permit id: 0 | |||||
SCORE 61 655 New York Avenue Nw Washington Dc Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway(s) close existing, paving; sidewalk (porous pervious), paving; sidewalk(s), fixture; bike rack(s), landscaping; new tree space(s), landscaping; tree planting Permit status: 10 | Expiration date: May 31, 2017 | Permit id: 0 |