QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 66 Columbia Road Nw And Mozart Place Nw Washington Dc The proposed streetscape work fronting the new residential with ground floor retail development building, located at the se corner of the mozart place nw and columbia road nw intersection, will include the following items: - new 6 wide ddot standard sidewalks - 1 new tree space and repairing the 8 existing tree spaces to be standard length and widths. The 1 new tree will adhere to urban forestrys structural soil volumes. -new cobble pavers between the tree spaces, on both columbia and mozart -2 new pepco vaults with planting buffer strip on 3 sides, along columbia - 2 existing fully topped pepco vaults along columbia road, at corner of columbia and mozart, are to remain and be re-topped to match sidewalk paving and proposed sidewalk grades. -new 26 wide curb cut along mozart for box truck loading and 2-way residential parking access. - 2 new ddot compliant handicap ramps at se corner of columbia road and mozart place nw. -new asphalt mill and overlay fronting the project along both col Date: October 12, 2015 Contractor: Hope RichardsonPermit type: Paving; ada curb ramp, paving; curb & gutter | Permit status: Revise and resubmit | Expiration date: November 23, 2016 | |||||
SCORE 66 Columbia Road Nw And Mozart Place Nw Washington Dc Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway(s) new -residential, paving; mill and overlay, paving; sidewalk (porous pervious), paving; sidewalk(s), landscaping; new tree space(s), landscaping; tree planting, fixture; bike rack(s) Contractor: Hope RichardsonPermit status: 10 | Expiration date: November 23, 2016 | Permit id: 0 | |||||
SCORE 66 Columbia Road Nw And Mozart Place Nw Washington Dc The proposed streetscape work fronting the new residential with ground floor retail development building, located at the se corner of the mozart place nw and columbia road nw intersection, will include the following items: - new 6 wide ddot standard sidewalks - 1 new tree space and repairing the 8 existing tree spaces to be standard length and widths. The 1 new tree will adhere to urban forestrys structural soil volumes. -new cobble pavers between the tree spaces, on both columbia and mozart -2 new pepco vaults with planting buffer strip on 3 sides, along columbia - 2 existing fully topped pepco vaults along columbia road, at corner of columbia and mozart, are to remain and be re-topped to match sidewalk paving and proposed sidewalk grades. -new 26 wide curb cut along mozart for box truck loading and 2-way residential parking access. - 2 new ddot compliant handicap ramps at se corner of columbia road and mozart place nw. -new asphalt mill and overlay fronting the project along both col Contractor: Hope RichardsonPermit status: Revise and resubmit | Expiration date: November 23, 2016 | Permit id: 0 | |||||
SCORE 66 Columbia Road Nw And Mozart Place Nw Washington Dc Paving; ada curb ramp, paving; curb & gutter(s), paving; driveway(s) new -residential, paving; mill and overlay, paving; sidewalk (porous pervious), paving; sidewalk(s), landscaping; new tree space(s), landscaping; tree planting, fixture; bike rack(s) Contractor: Hope RichardsonPermit status: 10 | Expiration date: November 23, 2016 | Permit id: 0 | |||||
SCORE 66 Columbia Road Nw And Mozart Place Nw Washington Dc The proposed streetscape work fronting the new residential with ground floor retail development building, located at the se corner of the mozart place nw and columbia road nw intersection, will include the following items: - new 6 wide ddot standard sidewalks - 1 new tree space and repairing the 8 existing tree spaces to be standard length and widths. The 1 new tree will adhere to urban forestrys structural soil volumes. -new cobble pavers between the tree spaces, on both columbia and mozart -2 new pepco vaults with planting buffer strip on 3 sides, along columbia - 2 existing fully topped pepco vaults along columbia road, at corner of columbia and mozart, are to remain and be re-topped to match sidewalk paving and proposed sidewalk grades. -new 26 wide curb cut along mozart for box truck loading and 2-way residential parking access. - 2 new ddot compliant handicap ramps at se corner of columbia road and mozart place nw. -new asphalt mill and overlay fronting the project along both col Contractor: Hope RichardsonPermit status: Revise and resubmit | Expiration date: November 23, 2016 | Permit id: 0 |