QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 217 Amboy Rd, Asheville, Nc 28806 Restucco exterior of building;scc; building safety review comments the approved plans with the attached review comments are required to be at the job site for use by the field inspector(s) at all times. The building permit is required to be posted at the jobsite at all times. Call harry taylor for building inspection at redacted phone number. All subcontractors need to complete trade application for project. Subcontractors need to either visit the permit office or fax copy of application to (828)redacted phone number for activation of electrical, plumbing or mechanical permits.; flood permit comments approved with the following conditions: 1. Air conditioning units must be elevated to 1 foot above the 1 year flood plain level. 2. Elevation certificate will be required to be submitted to the engineering department before a co can be issued. If you have any questions do not hesitate to call at redacted phone number. Natalie berry, cfm Client: Eblen Stucco | Permit type: Com: remodel | Permit status: Closed | Current use: Commercial | Permit id: 03-04858 | Parcel: 15625 |