QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 74 469 E 8th Ave, Salt Lake City, Ut, 84103 3152 Solar photovoltaic system consisting of 9 solar panels each tied to a microinverter. The system will be tied to the grid and be net metered. Date: November 30, 2012 Contractor: Gardner Engineering Aesmark Molen SolarPermit type: Permit | Permit status: Pass | Completion date: December 12, 2012 | Current use: Residential | Permit id: Bld2012-08756 | |||||
SCORE 74 469 E 8th Ave, Salt Lake City, Ut, 84103 3152 Building permit required for system installation required. Solar photovoltaic system consisting of 9 solar panels each tied to a microinverter. The system will be tied to the grid and be net metered. Date: November 29, 2012 Contractor: Gardner Engineering Aesmark Molen SolarPermit type: Electrical | Permit status: Pass | Completion date: December 12, 2012 | Current use: Residential | Permit id: Bld2012-08754 | |||||
SCORE 74 469 E 8th Ave Salt Lake City, Ut 84103 3152 Solar photovoltaic system consisting of 9 solar panels each tied to a microinverter. The system will be tied to the grid and be net metered. Date: November 30, 2012 Contractor: Gardner Engineering Aesmark Molen SolarPermit type: Permit | Permit status: Closed | Completion date: December 12, 2012 | Current use: Residential | Permit id: Bld2012-08756 | |||||
SCORE 74 469 E 8th Ave Salt Lake City, Ut 84103 3152 Building permit required for system installation required. Solar photovoltaic system consisting of 9 solar panels each tied to a microinverter. The system will be tied to the grid and be net metered. Date: November 29, 2012 Contractor: Gardner Engineering Aesmark Molen SolarPermit type: Electrical | Permit status: Closed | Completion date: December 12, 2012 | Current use: Residential | Permit id: Bld2012-08754 | |||||
SCORE 74 469 E 8th Ave, Salt Lake City, Ut, 841033152 Building permit required for system installation required. Solar photovoltaic system consisting of 9 solar panels each tied to a microinverter. The system will be tied to the grid and be net metered. Date: November 29, 2012 Contractor: Gardner Engineering Aesmark Molen SolarPermit type: Electrical | Permit status: Pass | Completion date: December 12, 2012 | Current use: Residential | Permit id: Bld2012-08754 | |||||
SCORE 74 469 E 8th Ave, Salt Lake City, Ut, 841033152 Solar photovoltaic system consisting of 9 solar panels each tied to a microinverter. The system will be tied to the grid and be net metered. Date: November 30, 2012 Contractor: Gardner Engineering Aesmark Molen SolarPermit status: Pass | Completion date: December 12, 2012 | Current use: Residential | Permit id: Bld2012-08756 | |||||
SCORE 74 469 E 8th Ave Salt Lake City, Ut 841033152 Building permit required for system installation required. Solar photovoltaic system consisting of 9 solar panels each tied to a microinverter. The system will be tied to the grid and be net metered. Date: November 29, 2012 Contractor: Gardner Engineering Aesmark Molen SolarPermit type: Electrical | Permit status: Closed | Completion date: December 12, 2012 | Current use: Residential | Permit id: Bld2012-08754 | |||||
SCORE 74 469 E 8th Ave Salt Lake City, Ut 841033152 Solar photovoltaic system consisting of 9 solar panels each tied to a microinverter. The system will be tied to the grid and be net metered. Date: November 30, 2012 Contractor: Gardner Engineering Aesmark Molen SolarPermit status: Closed | Completion date: December 12, 2012 | Current use: Residential | Permit id: Bld2012-08756 |