QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 6926 Willow St Nw, Washington, Dc 20012 We will perform one soil boring and one infiltration auger probe on the proposed site. The boring and infiltration auger probe will be advanced to depths of feet and 6 feet, respectively. The boring/auger probe will be located within the bounds of the property. The boring/auger probes will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. The boring/auger probe will be performed utilizing an atv-mounted drill rig and will generate an approximate 6-inch annulus. After geotechnical exploration is completed, the boring/auger probe will be backfilled with bentonite slurry, which has a consistency of two pounds bentonite powder to one gallon water. Borehole/auger probe abandonment will be performed by tremie-grouting via a positive-displacement pump from the bottom of the borehole/auger probe. Date: February 3, 2014 Contractor: Douglas Jemal Ecs Midatlantic LlcClient: Douglas Jemal | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400135 |