QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 64 Pave 5 sidewalk and install new driveway approach per city of renton standard details. Modification approved allowing for 5 sidewalks. Client: Suciu Cosmin+sorina | Permit type: Engineering | Permit status: Plan check approved | Permit id: U16005006 | Parcel: 3450400330 | |||||
SCORE 64 Install new sewer stub from main to property line. If the owner submits a video inspection of the concrete sewer stub (make video at time of capping sewer stub at property line) and if the city determines the stub meets the city standards of grade and water tightness then and only then the licensed sewer contractor may line the sewer stub to create a new sewer stub. If not approved by the city then the licensed sewer contractor must core the sewer main in the street and install a new 6" pvc stub to the property line. All work and trench restoration must be to city of renton standards. Client: Suciu Cosmin+sorina | Permit type: Sewer | Permit status: Pending | Permit id: Ss16005003 | Parcel: 3450400330 | |||||
SCORE 64 Connect roof drains to gravel filled infiltration trench. Infiltration trench connected to storm stub for overflow. All storm piping and connections shall be open for inspection. Client: Suciu Cosmin+sorina | Permit type: Storm | Permit status: Pending | Permit id: Sw16005005 | Parcel: 3450400330 | |||||
SCORE 64 Install side sewer from house to new stub Client: Suciu Cosmin+sorina | Permit type: Sewer | Permit status: Pending | Permit id: Ss16005004 | Parcel: 3450400330 |