QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 65 231 Furley St Philadelphia Pa 191202334 Replace water service from meter to main-pa1#20153001598-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: November 3, 2015 Contractor: Conifer Lechase ConstructionClient: Morris Wayne D | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 17, 2016 | Permit id: 649619 | |||||
SCORE 65 2701 Holme Ave Philadelphia Pa 191522015 Interior exterior alterations to exisitng structure, interior demo, renovations ,new units floor configurations, accessibility upgrades. Structural work and modifications, framing support, roof dunnage installations, add compactor room and footings, exterior walls and facade repairs, parapet and roof work,exterior site work for parking lot, ramps, walkways, landscaping reconfiguration within pl. Building fully sprinklered. No co on record. Additional permits req: electrical, plumbing, hvac, sprinklers. Stormwater management site work, storm sewer connections and removals, street sidewalk r. O. W work and sewer connections, installations approved by others required. Not part of permit. Date: November 17, 2015 Contractor: Conifer Lechase ConstructionPermit type: Alteration permit | Permit status: Completed | Completion date: June 9, 2017 | Permit id: 648619 | |||||
SCORE 65 2701 Holme Ave Philadelphia Pa 191522015 Amend permit #648619-the compactor room has been eliminated and revised into an outdoor maintenance area with ramp connected to the 1st floor compactor room. Community room, management office, social service office, health ste, and mail have been relocated on the 2nd floor and apt units that were previously on the 2nd floor have been removed to the 1ft floor. The laundry room has been relocated to the 3rd floor and the fitness room relocated to the 6th floor. The proposed ramp from the parking area connecting into the existing ramp to the 1st floor has been eliminated. Date: August 11, 2016 Contractor: Conifer Lechase ConstructionPermit type: Administrative permit | Permit status: Completed | Completion date: June 9, 2017 | Permit id: 704970 |