QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 825 Stillwater Rd, West Sacramento, Ca San Diego Ca Replace approximately section of curb which is sunken along stillwater. Verify location of water meter and sewer cleanout are within city right of way. If not, they shall be relocated into right-of-way. On site, relocation storm drain from under proposed building. Landscape: install backflow device to landscape connection. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Date: July 20, 2009 Contractor: Bob Leonard And AssociatesPermit id: 09-0204 | Parcel: 014794007000 |