QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 24 W California Ave, Salt Lake City, Ut, 841044563 Please provide es report to carol. Vaea@slcgov. Com membrane roof: 1. Grid cut and remove the existing roof membrane. By grid cutting, we are leaving the mechanically attached seams in place. 2. Inspect the existing insulation. Any wet or deteriorated insulation will be replaced at 1. 55 per board foot and will be added to the base bid. 3. Mechanically fasten a mil tpo roof membrane over the existing insulation. This membrane will be a white membrane. Install one 6 perimeter sheet. 4. Install all new base-flashing along all vertical walls. Along the walls we will extend the tpo membrane up the wall and over the wall. 5. Install new color clad, standing seam cap metal on all parapet walls. 6. Install all new pipe boots on all pipes. 7. Remove all associated roof debris and leave the job site neat and clean. Note: they are have a new unit installed. We need to coordinate with marcus from bills comfort systems (801-725-5931) metal roof: 1. Reseal the metal to wall transition with mulehi Date: January 12, 2017 Contractor: Amco American Roofing Cowasatch EnvironmentalPermit type: Roofing | Permit status: Need info | Completion date: January 12, 2017 | Current use: Commercial | Permit id: Bld2017-00221 |