QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 3537 S St Nw, Washington, Dc 20007 Installation of silt and construction fencing. Excavate from grade line down to footer in specified areas. After exposing of wall, patch and seal cracks and holes that may have formed. Scarify wall to remove any existing waterproofing membrane and loose parging. Parge wall as may be required. Installation of sonneborn hlm-50 liquid cold-applied waterproofing membrane at mils. During excavation, if there is a french drainage system at footer, it will be destroyed and replaced with new, tying in to existing system. Installation of protection course over newly installed waterproofing membrane. Perform water test, preferably with owner or designated representative present to insure all leaks have been remedied. After completion of successful water test, proceed to backfill, using mechanical tamper to compact soil. Removal of silt and construction fencing to complete. Date: July 7, 2014 Contractor: Alison Suarez Chamberlinwashington IncClient: Erik Warga | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Wp1400130 |