QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 301 Bryant St Nw, Washington, Dc 20001 This project entails process-related upgrades to the bryant street pumping station potable water spillage header system including replacement of seven 16-inch manual pressure control valves with new automated pressure control valves, replacement of fourteen 16-inch isolation valves and ten 16 to 24-inch interconnecting valves with motor operated butterfly valves, installation of nine new 24 to 36-inch magnetic flow meters, installation of new air release valves, installation of associated electrical and instrumentation systems, structural improvements to pipe supports and safety hand rails, and other upgrades to the spillage header system integration with supervisory control and data acquisition - scada. Date: July 6, 2016 Contractor: Susan Macneil Pe District Of Columbia Water AndClient: District Of Columbia | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1607694 |