| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 3212 Georgia Ave Nw, Washington, Dc 20010 Phase ii environmental site assessment for construction of a multi rise building. Phase ii will include drilling of 5 borings by hollow stem auger method. 3 of these borings will be drilled to 12 feet deep and will be converted to temporary wells, 2 borings will be drilled to feet, all borings approximately 6 inches in diameter. Temporary borings will be abandoned (grouted) within 24 hours of installation, investigation derived wastes (drill cuttings) will be containerized for off-site disposal. Date: February 18, 2014 Contractor: Kim Engineering IncClient: Zuckerman Partners, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400183 |