QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 69 816 Potomac Avenue Se Washington Dc Close 3 existing curb cuts, remove 2 street trees, remove/replace circular driveway, remove parking area in public space. Construct a circular driveway with 2 new curb cuts on potomac avenue, se, new driveway curb cut on l street, se for garage entry. Plant street trees, expand tree box landscape area, construct building projections, lead walks, window-wells, areaway entry, stoops and steps, bioretention areas, open design fence, electric vault, water and sewer abandonments and replacement, various landscaping grasses and plants, and repair/replace sidewalk as necessary. Initial submittal for concept review and psc presentation. Date: April 22, 2015 Contractor: 818 Potomac Ave Se Llc George WebbPermit type: Paving; driveway | Permit status: Cancel/withdrawn | Expiration date: September 29, 2016 | |||||
SCORE 69 816 Potomac Avenue Se Washington Dc Close 3 existing curb cuts, remove 2 street trees, remove replace circular driveway, remove parking area in public space. Construct a circular driveway with 2 new curb cuts on potomac avenue, se, new driveway curb cut on l street, se for garage entry. Plant street trees, expand tree box landscape area, construct building projections, lead walks, window-wells, areaway entry, stoops and steps, bioretention areas, open design fence, electric vault, water and sewer abandonments and replacement, various landscaping grasses and plants, and repair replace sidewalk as necessary. Initial submittal for concept review and psc presentation. Date: April 22, 2015 Contractor: 818 Potomac Ave Se Llc George WebbPermit type: Paving; driveway | Permit status: Cancel/withdrawn | Expiration date: September 29, 2016 | |||||
SCORE 69 816 Potomac Avenue Se Washington Dc Paving; driveway(s) circular, paving; driveway(s) close existing, paving; driveway(s) new -residential, paving; leadwalk only, fixture; bike rack(s), fixture; fence to 42" (open design), fixture; knee wall to 30", landscaping; new tree space(s), landscaping; stormwater mgmt (serve public), landscaping; tree planting, landscaping; tree removal, excavation; manhole installation, excavation; sewer lateral connection over 4" pipe (trench), excavation; sewer service lateral abandonment, excavation; storm lateral conn over 4" (trench), excavation; valves (excavation), excavation; vault(s) lxw, excavation; water lateral conn over 2" pipe (trench), excavation; water meter manhole (over 2" pipe), excavation; water service lateral abandonment (trench), projections; ada ramp, projections; areaway entrance, projections; stoop & steps, projections; window well(s) Contractor: 818 Potomac Ave Se Llc George WebbPermit status: 3 | Expiration date: September 29, 2016 | Permit id: 0 | |||||
SCORE 69 816 Potomac Avenue Se Washington Dc Close 3 existing curb cuts, remove 2 street trees, remove replace circular driveway, remove parking area in public space. Construct a circular driveway with 2 new curb cuts on potomac avenue, se, new driveway curb cut on l street, se for garage entry. Plant street trees, expand tree box landscape area, construct building projections, lead walks, window-wells, areaway entry, stoops and steps, bioretention areas, open design fence, electric vault, water and sewer abandonments and replacement, various landscaping grasses and plants, and repair replace sidewalk as necessary. Initial submittal for concept review and psc presentation. Contractor: 818 Potomac Ave Se Llc George WebbPermit status: Cancel/withdrawn | Expiration date: September 29, 2016 | Permit id: 0 | |||||
SCORE 69 816 Potomac Avenue Se Washington Dc Paving; driveway(s) circular, paving; driveway(s) close existing, paving; driveway(s) new -residential, paving; leadwalk only, fixture; bike rack(s), fixture; fence to 42" (open design), fixture; knee wall to 30", landscaping; new tree space(s), landscaping; stormwater mgmt (serve public), landscaping; tree planting, landscaping; tree removal, excavation; manhole installation, excavation; sewer lateral connection over 4" pipe (trench), excavation; sewer service lateral abandonment, excavation; storm lateral conn over 4" (trench), excavation; valves (excavation), excavation; vault(s) lxw, excavation; water lateral conn over 2" pipe (trench), excavation; water meter manhole (over 2" pipe), excavation; water service lateral abandonment (trench), projections; ada ramp, projections; areaway entrance, projections; stoop & steps, projections; window well(s) Contractor: 818 Potomac Ave Se Llc George WebbPermit status: 3 | Expiration date: September 29, 2016 | Permit id: 0 | |||||
SCORE 69 816 Potomac Avenue Se Washington Dc Close 3 existing curb cuts, remove 2 street trees, remove replace circular driveway, remove parking area in public space. Construct a circular driveway with 2 new curb cuts on potomac avenue, se, new driveway curb cut on l street, se for garage entry. Plant street trees, expand tree box landscape area, construct building projections, lead walks, window-wells, areaway entry, stoops and steps, bioretention areas, open design fence, electric vault, water and sewer abandonments and replacement, various landscaping grasses and plants, and repair replace sidewalk as necessary. Initial submittal for concept review and psc presentation. Contractor: 818 Potomac Ave Se Llc George WebbPermit status: Cancel/withdrawn | Expiration date: September 29, 2016 | Permit id: 0 |